background image

Manual 2100-353
Page

8

FIGURE  1

DIMENSIONS OF UNITS

MIS-1305

TABLE  5

DIMENSIONS OF UNITS

l

e

d

o

M

.

o

N

)

s

e

h

c

n

I

(

s

n

o

i

s

n

e

m

i

D

t

e

n

i

b

a

C

l

a

n

i

m

o

N

)

s

e

h

c

n

I

(

g

n

i

n

e

p

O

t

c

u

D

H

e

g

r

a

h

c

s

i

D

r

i

A

n

r

u

t

e

R

A

B

C

J

K

L

M

D

E

F

G

3

A

4

2

1

1

P

2

A

4

2

2

1

P

2

A

0

3

1

1

P

1

A

0

3

2

1

P

2

A

6

3

1

1

P

1

A

6

3

2

1

P

4

/

1

-

4

2

6

1

/

3

-

8

4

8

/

1

-

8

3

8

/

1

-

6

2

8

/

1

-

2

6

1

/

9

6

1

/

9

3

3

6

3

3

4

1

8

/

7

3

A

2

4

1

1

P

1

A

2

4

2

1

P

2

A

8

4

1

1

P

2

A

8

4

2

1

P

1

A

0

6

0

1

P

4

/

1

-

1

3

0

5

2

4

6

2

3

4

/

3

-

2

6

1

/

9

-

7

8

3

0

1

8

3

6

1

8

/

3

-

1

Summary of Contents for P1124A3

Page 1: ...P1230A1 P1136A2 P1236A1 P1142A3 P1242A1 P1148A2 P1248A2 P1060A1 INSTALLATION INSTRUCTIONS Manual 2100 353D Supersedes 2100 353C File Volume II Tab 10 Date 03 19 03 Bard Manufacturing Company Bryan Ohi...

Page 2: ...sions 8 Figure 2 Slab Mounting at Ground Level 10 Figure 3 Airflow and Service Access Clearances 10 Figure 4 Roof Top Application 11 Figure 5 Elevated Mounting Platforms 11 Figure 6 Prefabricated Rood...

Page 3: ...and Summer Air Conditioning Duct Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning Co...

Page 4: ...to the equipment While these instructions are intended as a general recommended guide they do not supersede any national and or local codes in any way Authorities having jurisdiction should be consult...

Page 5: ...e r p m o C l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S s t l o V 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 0 6 4 8 0 2 0 3 2 s p m A d a o L d e t a R 0 9 5 8 6 3 1...

Page 6: ...o s s e r p m o C l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S l l o r c S s t l o V 8 0 2 0 3 2 8 0 2 0 3 2 0 6 4 8 0 2 0 3 2 8 0 2 0 3 2 0 6 4 s p m A d a o L d e t a R 5 0 2 5 8 1 4...

Page 7: ...l o r c S l l o r c S l l o r c S l l o r c S s t l o V 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 8 0 2 0 3 2 s p m A d a o L d e t a R 0 9 5 8 8 2 1 4 1 1 2 6 1 3 4 1 9...

Page 8: ...0 4 2 A N S A N A N A N A N A N A N A N 5 1 A C P 3 H E 1 8 0 2 0 4 2 A N A N A N S A N A N A N S A N 9 0 B B P 3 H E 3 8 0 2 0 4 2 A A N A A N A S A A N S 5 1 B B P 3 H E 3 8 0 2 0 4 2 A N A N A A N...

Page 9: ...2 7 2 3 8 0 6 0 3 0 6 0 6 1 1 1 1 3 2 6 2 6 4 3 5 8 6 9 7 1 9 4 0 1 5 2 0 3 0 5 0 6 0 7 0 8 0 0 1 0 1 1 0 1 0 1 8 6 4 4 3 2 0 1 0 1 8 6 9 0 B B P 3 H E 5 1 B B P 3 H E 3 8 0 2 0 4 2 3 8 0 2 0 4 2 9 5...

Page 10: ...c n I g n i n e p O t c u D H e g r a h c s i D r i A n r u t e R A B C J K L M D E F G 3 A 4 2 1 1 P 2 A 4 2 2 1 P 2 A 0 3 1 1 P 1 A 0 3 2 1 P 2 A 6 3 1 1 P 1 A 6 3 2 1 P 4 1 4 2 6 1 3 8 4 8 1 8 3 8...

Page 11: ...ing with the operation of the unit A minimum of twelve inch elevation is recommended while greater elevation may be required for areas of high snow accumulation Poured concrete steel framework brick c...

Page 12: ...Manual 2100 353 Page 10 FIGURE 2 SLAB MOUNTING AT GROUND LEVEL Above 32 F Outside Temperature MIS 1184 FIGURE 3 AIRFLOW AND SERVICE ACCESS CLEARANCES MIS 1185...

Page 13: ...Manual 2100 353 Page 11 FIGURE 5 ELEVATED MOUNTING PLATFORMS MIS 1183 FIGURE 4 ROOF TOP APPLICATION May also be required for ground level installations MIS 1176...

Page 14: ...Manual 2100 353 Page 12 FIGURE 6 PREFABRICATED ROOF CURB SPECIFICATIONS HEAVY GAUGE GALVANIZED WITH WOOD NAILING STRIP WELDED LEAKPROOF ONCE PIECE CONSTRUCTION READY TO INSTALL MIS 1177C...

Page 15: ...P 1 A 2 4 2 1 P 2 A 8 4 1 1 P 2 A 8 4 2 1 P 1 A 0 6 0 1 P 0 6 E H R 4 0 0 2 4 0 9 5 7 3 2 8 5 2 1 4 4 5 2 1 1 4 5 7 3 8 3 5 7 3 5 3 4 4 5 2 1 3 5 2 1 9 1 0 5 5 7 4 1 2 4 5 2 8 3 j A SEPARATE METAL FLA...

Page 16: ...AIR FILTERS Air filters for the return air side of the system are not provided as part of these models and must be field supplied and installed as part of the final installation Prior thought should b...

Page 17: ...th the equipment The correct size must be used for proper circuit protection and also to assure that there will be no nuisance tripping due to the momentary high starting current of the compressor WIR...

Page 18: ...Manual 2100 353 Page 16 FIGURE 9 LOW VOLTAGE WIRING MIS 1180...

Page 19: ...tarting the compressor and outdoor motor The G indoor motor circuit is automatically completed on any call for cooling operation or can be energized by manual fan switch on subbase for constant air ci...

Page 20: ...rm signal is desired This terminal is powered whenever compressor is locked out due to HPC or LPC sequences as described NOTE Both high and low pressure switch controls are inherently automatic reset...

Page 21: ...mperative to match the correct pressure table to the unit by model number REFRIGERANT CHARGE The correct system R 22 charge is shown on the unit rating plate Optimum unit performance will occur with a...

Page 22: ...ormly around the circumference to flow braze material completely around the joint Slowly move torch into Area 3 to draw braze material into joint See Figure 11 Do not overheat joint MIS 1179 FIGURE 11...

Page 23: ...5 2 2 1 8 0 4 2 2 8 0 6 2 4 8 8 7 2 5 8 5 9 2 6 8 5 1 3 7 8 5 3 3 8 8 1 5 3 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 4 8 2 1 2 6 8 3 3 2 7 8 8 4 2 8 8 9 6 2 0 9 7 8 2 1 9 5 0 3 2 9 6...

Page 24: ...d 5 7 B W g e d 2 6 e d i S w o L e d i S h g i H 3 7 3 0 2 4 7 8 1 2 5 7 1 3 2 6 7 6 4 2 8 7 4 6 2 9 7 8 7 2 0 8 4 9 2 1 8 2 1 3 2 8 0 3 3 B D g e d 0 8 B W g e d 7 6 e d i S w o L e d i S h g i H 8...

Page 25: ...k c e h C d e e p s M F C h g i h t a s f f u p r o s t n u H g n i f f u p e c u d e r r e t l i f r o l e n a p g n i v o m e r s e o D n o i t c i t s e r e c u d e R w o l f r i a m u m i x a m e...

Page 26: ...w s c a i r T r o f k c e h C y a l e r N O T P M Y S E R U D E C O R P E S U A C e s i o n e v i s s e c x E e s i o n r o t o m r o t c u d t e n i b a c e s i o n r i a s i t i f i e n i m r e t e...

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Reviews: