
Manual 2100-696A
Page
6 of 17
When the CRV is fully installed, the control plug should
be centered in the plug access opening on the front
panel of the CRV as shown in Figure 11.
Before installing vent, remove CRV from packaging
and verify there is no damage. Install the vent from
the side as shown in Figure 10. CRV can be installed
from either side.
Set CRV on the exhaust partition (see Figure 5 on page
5) and slide in until flush with the side of the wall
mount.
From the front, through the filter opening, plug the CRV
power plug into the control panel plug (see Figure 12).
IMPORTANT:
Sharp edges--PPE required.
The CRV exhaust blade is fixed in the shipping position
by two (2) screws, one on each side (see Figure 13).
Remove screws to release the blade.
Connect 3000-1622 wire assembly (see Figure 9).
Snap the 4 pin connector into the opening next to the
low voltage box and plug the 12 pin male connector
into the female plug in the low voltage box.
4 Pin
Connector
12 Pin Male
Connector
FIGURE 9
Connect 3000-1622 Wire Assembly
FIGURE 10
Install Vent
FIGURE 11
Control Plug Centered in Plug Access Opening
FIGURE 12
Connect CRV Power Plug to Control Panel Plug
FIGURE 13
Remove Blade Shipping Screws