![background image](http://html1.mh-extra.com/html/barco/r9002031/r9002031_installation-manual_4222540014.webp)
Installation setup
4-3
5975607 BARCODATA 808s 170397
- Press the module lock and lift up the module handle;
- Repeat this action on both sides of the module and extract the
module out of the main frame.
Side view
Top view
Top view
Side view
Push
Connectors for the vertical
deflection module
Vertical scan switch
)52177$%/(
5($57$%/(
5($5&(,/,1*
)5217&(,/,1*
9HUWLFDOVFDQ
VZLWFK
+RUL]RQWDO
VFDQVZLWFKHV
Vertical Scan Switch
One vertical switch is used for the three CRT's. See position of the
switch (diagrams) for the corresponding projector configuration.
To set the vertical scan switch :
Remove the vertical deflection module (the third module viewing
from the rear of the projector).
To remove the vertical deflection module :
Vertical deflection module
Toggle the vertical scan inversion switch to the correct position.
Reinstall the vertical deflection module.
Positions of the scan switches for the different mounting configura-
tions are illustrated on the right side.
After setting the scan switches, close the metal protection plate and
secure it with the retaining screws.
Close the top cover and reconnect the power cord to the wall outlet.
Note : Switching over from Floor to Ceiling or vice versa
requires a complete readjustment of picture geometry and
convergence.
Summary of Contents for R9002031
Page 1: ...R9002031 R9002038 INSTALLATION MANUAL DATA 808s...
Page 19: ...Projector setup 5 4 5975607 BARCODATA 808s 170397...
Page 23: ...AC power connection 6 4 5975607 BARCODATA 808s 170397...
Page 35: ...Installation adjustment mode 8 8 5975607 BARCODATA 808s 120397...
Page 41: ...Appendix B G2 adjustment B 2 5975607 BARCODATA 808s 170397...