3-9
Installation Guidelines
5976229 BARCO SLM G5 12062001
Rigging points and Accessories.
Clamps
Slots are made in the carry handle frame for easy inserting the overlockers and for easy adjusting the clamps position so that this
position matches with the rigging points.
Consult a professional structural engineer prior to suspending the ceiling mount from a structure not intended for that use. Always
ensure the working load limit of the structure supporting the projector.
When mounting the projector to the ceiling or to a rigging system, always mount security chains.
Image 16
Image 17
Image 15
&
%
%
Summary of Contents for R9001890
Page 8: ...i 6 Table of Contents 5976229 BARCOSLM G5 10052001...
Page 13: ...2 3 Packaging and Dimensions 5976229 BARCOSLM G5 05012001...
Page 14: ...2 4 Packaging and Dimensions 5976229 BARCOSLM G5 05012001...
Page 34: ...4 10 Connections 5976229 BARCOSLM G5 15032001...
Page 72: ...8 10 Installation Mode 5976229 BARCOSLM G5 10052001...
Page 84: ...Programmable Function Keys 10 2 5976229 BARCO SLM G5 05012001...