7. Basic set up procedures
Image 7-19
Install stacker profile.
6. Secure the stacker profile with the foot and the bridge using two lock keys and four spring cotters.
W
ARNING
:
Ensure that each lock key is secured with two spring cotters.
7.10 Secure a hanging OLite rental display
Necessary parts
Safety steel cables or chains.
How to secure a hanging OLite rental display ?
1. Lift up the OLite display to the desired height.
2. Place a safety steel cable or chain around the truss installation above the OLite display and through the safety eyebolt on the
truss beam. Use one safety steel cable or chain per safety eyebolt.
Warning:
The angle between the rental truss beam and the safety steel cable or chain must be at least 45º.
34
R5976832 OLITE RENTAL DISPLAY 15/12/2004
Summary of Contents for OLite 510
Page 1: ...OLite rental display Installation manual R5976832 00 15 12 2004...
Page 4: ......
Page 10: ...1 Safety 6 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 12: ...2 Installation requirements 8 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 14: ...3 System overview 10 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 22: ...4 Components of an OLite rental tile 18 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 46: ...7 Basic set up procedures 42 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 52: ...8 Cabling of an OLite rental display 48 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 54: ...9 Maintenance 50 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 64: ...A Dimensions 60 R5976832 OLITE RENTAL DISPLAY 15 12 2004...
Page 70: ...C Order info 66 R5976832 OLITE RENTAL DISPLAY 15 12 2004...