3. Physical installation
3.1
Installation of the Lamp House
W
ARNING
:
Before installing the Lamp House, disconnect the power to the projector mains terminals and
unplug the power cord at the UPS INLET for removal of all power from the projector.
Necessary tools
10 mm nut driver or
fl
at screwdriver
How to install the Lamp House in the projector?
1. Remove the lamp cover.
2. Position the turning wires of the six
quarter turn screws
(1) so that they are
fl
ush with the cover. If this is not the case, interfer-
ence may occur while inserting the Lamp House.
1
Image 3-1
Positioning the quarter turn screws
3. Grip the Lamp House by both handles (2 and 3) and place the front of the Lamp House on the base plate inside the lamp com-
partment of the projector, lining up the foot of the Lamp House with the slots on the base.
Warning:
Be aware of the weight of the Lamp House. Take the necessary precautions to avoid personal injury.
4. Push the Lamp House fully into the slots.
5. Secure the Lamp House by fastening the two retaining screws (1) at the base of the Lamp House. Use a 10 mm nut driver or a
fl
at screwdriver.
1
2
3
Image 3-2
Installation of the Lamp House
6. Install the lamp cover.
18
R5905823 HDQ 4K35 30/11/2015
Summary of Contents for HDQ 4K35
Page 1: ...HDQ 4K35 User and Installation manual R5905823 04 30 11 2015 ...
Page 4: ......
Page 58: ...4 Lenses Lens Holder 54 R5905823 HDQ 4K35 30 11 2015 ...
Page 69: ...6 Starting up 6 STARTING UP R5905823 HDQ 4K35 30 11 2015 65 ...
Page 70: ...6 Starting up 66 R5905823 HDQ 4K35 30 11 2015 ...
Page 84: ...7 Maintenance 80 R5905823 HDQ 4K35 30 11 2015 ...
Page 96: ...8 Removal and installation of the projector covers 92 R5905823 HDQ 4K35 30 11 2015 ...
Page 98: ...A Dimensions and specifications 94 R5905823 HDQ 4K35 30 11 2015 ...
Page 108: ...B Environmental information 104 R5905823 HDQ 4K35 30 11 2015 ...