![Barco DP2K--20C Installation Manual Download Page 37](http://html1.mh-extra.com/html/barco/dp2k-20c/dp2k-20c_installation-manual_3917242037.webp)
4. Lamp & lamp house
Image 4-7
3. Release the four retaining thumbscrews of the UV blocker assembly as illustrated. Make sure that the UV blocker assembly
remains in its position while releasing the screws.
Image 4-8
4. Support the xenon lamp inside the Lamp House with one hand while removing the UV blocker assembly from the Lamp House.
Note that some xenon lamps are installed with an anode adaptation bushing.
Caution:
Ensure that you wear protective clothing, a full face shield and protective gloves.
Image 4-9
5. Slide the white anode socket, which is connected via a thick wire with the xenon lamp, upwards away from its position and then
remove the xenon lamp with anode socket from the Lamp House.
R59770351 DP2K-20C 02/02/2010
31
Summary of Contents for DP2K--20C
Page 1: ...DP2K 20C Installation manual R59770351 02 02 02 2010...
Page 5: ...Projector Pb Hg Cd Cr6 PBB PBDE x o o o o o RoHS...
Page 6: ......
Page 29: ...3 Physical installation 1 2 3 5 4 7 6 Image 3 11 R59770351 DP2K 20C 02 02 2010 23...
Page 82: ...8 Starting up 76 R59770351 DP2K 20C 02 02 2010...
Page 90: ...9 Projector registration Image 9 9 Add new owner 84 R59770351 DP2K 20C 02 02 2010...
Page 108: ...10 Removal and installation of projector covers 102 R59770351 DP2K 20C 02 02 2010...
Page 120: ...11 Maintenance 114 R59770351 DP2K 20C 02 02 2010...
Page 134: ...A Specifications 128 R59770351 DP2K 20C 02 02 2010...