Date: 03/06/98 Page 8
Installation guidelines
R9827341
R9827342
CM 100
4. Lifting up and fixation of the lower support (with projector) on the screwed rods.
Safety precautions:
- Standing under the lifted projector is
strictly forbidden for everybody.
- The person, pulling on the cord,
should watch the person on the ladder
and also strictly follow the given instruc-
tions
- Put the ladder min. 30 cm outside the
lifting range of the projector to avoid
touching the ladder.
- Lifting up the projector has to be done
very slowly to avoid swaying of it.
- Persons, not involved with the instal-
lation, have to be kept out of the work-
ing area.
After all safety precautions have been taken, proceed to lift up the projector.
While the assistent pulls on the cord, the leader holds the projector into position until the screwed rods pass through
the fixation holes on the lower support (holes 2).
The assistent holds the projector in this position while the leader screws on each rod a nut, taking care that the
nut is screwed on the rod fully. Secure this nut by turning a locking-nut against it.
When this is done and checked for safety, loosen the cord and proceed to projector-position correction.
Summary of Contents for CM 100
Page 12: ...Date 03 06 98 Page 12 Installation guidelines R9827341 R9827342 CM 100 LAY OUT UPPER SUPPORT ...
Page 14: ...Date 03 06 98 Page 14 Installation guidelines R9827341 R9827342 CM 100 Fig 3 ...
Page 15: ...Date 03 06 98 Page 15 Installation guidelines R9827341 R9827342 CM 100 Fig 4 ...
Page 17: ...Date 03 06 98 Page 17 Installation guidelines R9827341 R9827342 CM 100 Fig 6 ...