20
CUATRO-2 80
CUATRO-2 70
CUATRO-2 60
• Clad the appliance on the top, sides and rear up to the front edge with an
approx. 10 cm thick ceramic isolation wool fi reblanket. Leave a few
centimetres clearance between the front of the chimney breast and the
appliance.
• Level off the appliance. Check that the slides do not catch on the base.
• Make a good seal between the smoke outlet from the appliance to the
chimney. See also 3.3.4.
Ensure that the entire fl ue is gas-tight.
• Ventilate the chimney, by placing ventilation openings at the top and bottom
of the chimney breast.
Figure 1: Use of convection set and ventilation of fi replace
• Close up the front.
Summary of Contents for Cuatro-2 60
Page 2: ......
Page 3: ...3 CUATRO 2 70 CUATRO 2 60 CUATRO 2 80 CUATRO 2 60 CUATRO 2 80 CUATRO 2 70...
Page 4: ...4 CUATRO 2 80 CUATRO 2 70 CUATRO 2 60...
Page 6: ...6 CUATRO 2 80 CUATRO 2 70 CUATRO 2 60...
Page 30: ...30 CUATRO 2 80 CUATRO 2 70 CUATRO 2 60 Figure 3 Operation 4 2 CUATRO 2 with fan box...
Page 44: ...44 CUATRO 2 80 CUATRO 2 70 CUATRO 2 60 11 REPLACEMENT PARTS...
Page 46: ...46 CUATRO 2 80 CUATRO 2 70 CUATRO 2 60...
Page 59: ......