![barbas 90-60 PF2 Preparation Manual Download Page 49](http://html1.mh-extra.com/html/barbas/90-60-pf2/90-60-pf2_preparation-manual_3778765049.webp)
Fig.
No.
Ontop Art. /
Order No. Description
21
USAB 10
Cover band, screw-fastening.
23
USMB 10 Wall strap, adjustable.
23
USEB 10
Fitting bracket.
24
USCP 10
Set of ceiling finishing plates / Fire stops /Centering
plates.
24
USDQ 10 Roof support.
25
USSAN 10 Renovation set.
25 USSAN1 10 Top of renovation set.
25 USSAN2 10 Bottom renovation set.
Available components for the concentric flue system -
natural draught
Gas Fire Front 90-60
49