October 18, 2023
LC25 Pro Controller Instruction Manual
5
Chapter Contents
LC25C-WLF12 Full Preview Connection (Required)
LC25 Pro Controller with WLF12 Wiring ............................................................................................................................................................. 6
LC25 Pro Controller Remote TEACH Instructions .............................................................................................................................................. 6
LC25 Pro Controller Pro Editor TEACH Instructions ........................................................................................................................................... 6
Pro Editor Configuration ...................................................................................................................................................................................... 7
Pro Editor
Use Banner's Pro Editor software and Pro Converter Cable to create custom
configurations by selecting different colors, flash patterns, and animations.
For more information visit
www.bannerengineering.com/proeditor
LC25C-WLF12 Full Preview Connection (Required)
A
B
C
E
D
F
A = Pro Converter Cable (MQDC-506-USB)
B = Splitter (CSB-M1251FM1251M)
C = PC running Pro Editor software
D = LC25 Pro Controller (LC25C-WLF12-RGB7-Q)
E = Power Supply (PSW-24-1 or PSD-24-4)
F = WLF12 Pro Flexible LED Strip Light
Configuration Instructions
Chapter 2
© Banner Engineering Corp. All rights reserved.