![B&B ARMR Vertical Pivot Operation And Maintenance Manual Download Page 14](http://html.mh-extra.com/html/bandb-armr/vertical-pivot/vertical-pivot_operation-and-maintenance-manual_459657014.webp)
Installation and Operations Manual
— VP Gate Operator
14
B&B ARMR
A Division of B&B Roadway and Security Solutions VP Revision B1
6.1 Test Peripheral/Safety Devices
1.
Open the gate
2.
Close the gate, and test the installed devices.
Note: If the safety device is wired in the IR Beam connectors on the printed circuit board
(conn 5 and conn 7), the gate will stop the close command until the safety is cleared and
then continue to close. If the device is wired to the loopsafe on conn3, the gate will stop
and reverse back to the fully open position until the safety is cleared.