background image

Installation and Operations Manual 

— Model 730 Series 

APPENDIX

 

13 

 

B&B ARMR

                                                                                                                  

A Division of B&B Roadway and Security Solutions        

                                                                                            

0730-9001 Revision C2 

 

 

Equipment Maintenance Log Form 

Product Type:________________________ 

 

B&B ARMR 

 

 

 

 

 

 

 

 

800-367-0387 

Location:____________________________ 

[email protected]

 

 

Date 

Performed By 

Checklist 

Complete 

Anomalies 

Notes 

Jan 

 

 

Yes  No 

 

 

Feb 

 

 

Yes  No 

 

 

Mar 

 

 

Yes  No 

 

 

Apr 

 

 

Yes  No 

 

 

May 

 

 

Yes  No 

 

 

Jun 

 

 

Yes  No 

 

 

Jul 

 

 

Yes  No 

 

 

Aug 

 

 

Yes  No 

 

 

Sep 

 

 

Yes  No 

 

 

Oct 

 

 

Yes  No 

 

 

Nov 

 

 

Yes  No 

 

 

Year 

 

 

Yes  No 

 

 

 

 

 

Date 

Performed By 

Checklist 

Complete 

Anomalies 

Notes 

Jan 

 

 

Yes  No 

 

 

Feb 

 

 

Yes  No 

 

 

Mar 

 

 

Yes  No 

 

 

Apr 

 

 

Yes  No 

 

 

May 

 

 

Yes  No 

 

 

Jun 

 

 

Yes  No 

 

 

Jul 

 

 

Yes  No 

 

 

Aug 

 

 

Yes  No 

 

 

Sep 

 

 

Yes  No 

 

 

Oct 

 

 

Yes  No 

 

 

Nov 

 

 

Yes  No 

 

 

Year 

 

 

Yes  No 

 

 

 

Summary of Contents for 730 Series

Page 1: ...ity Solutions 0730 9001 Revision C2 MODEL 730 SERIES BEAM BARRIER OPERATIONS MAINTENANCE MANUAL B B ARMR Corporate Office Technical Support 5900 S Lake Forest Drive Suite 230 McKinney TX 75070 Phone 8...

Page 2: ...hout the world to control access and to protect people equipment and facilities We offer a broad range of vehicle barrier and related security services Turnkey installations Routine barrier preventati...

Page 3: ...andards of the Occupational Safety and Health Administration OSHA as well as other applicable federal state and local safety regulations and industry standards and procedures For installation outside...

Page 4: ...ty ii How to Contact Us iii 1 ORIENTATION 5 1 1 Overview 5 2 OPERATION 6 2 1 Introduction 6 2 2 First Time Operation 6 2 3 Control 7 2 4 Operating Time 7 3 MAINTENANCE 8 3 1 Introduction 8 3 2 Monthly...

Page 5: ...el 730 vehicle barrier 1 1 1 Gate Arm The steel gate arm is engineered to distribute the crash impact load over the drive and receiver stanchion Coupled with the specified concrete bases the stanchion...

Page 6: ...gate is fully open and it closes before the gate starts to close Red amber traffic lights The light remains red if the gate is in any position except fully open Infrared safety beams to detect pedestr...

Page 7: ...eceiver post and does not oscillate contact hard or make excessive noise 2 3 Control The 730 barrier is controlled by the flow of hydraulic fluid under pressure from the HPU to the cylinder All contro...

Page 8: ...We recommend you perform the following visual inspections monthly on the barrier system An equipment maintenance log is supplied in the appendix to assist in the logging Inspect the condition of the f...

Page 9: ...FF position Inspect the hydraulic system for signs of oil leaks CAUTION The hydraulic system when in operation is under extreme pressure Verify pressure on the barrier is completely relieved prior to...

Page 10: ...s mechanical or electrical 6 Check PLC input on pumping unit 7 Check that safeties are clear 8 Check PLC output on pumping unit 9 Check push button operation Barrier does not close when commanded on c...

Page 11: ...a for debris and proper lubrication dry graphite spray 3 Check hydraulic cylinder clevis pins for lubrication multi grade grease 4 Check bearing grease Hydraulic unit excessively hot 1 Check that the...

Page 12: ...ot limited to unauthorized repairs improper installation installation not performed by BBRSS authorized personnel incoming supply power is outside the tolerance for the product failure to perform manu...

Page 13: ...Location ____________________________ techsupport bb armr com Date Performed By Checklist Complete Anomalies Notes Jan Yes No Feb Yes No Mar Yes No Apr Yes No May Yes No Jun Yes No Jul Yes No Aug Yes...

Reviews: