
Light Weight Taut Wire Mk 15B Operation Manual
20
STEP
PROCEDURE
COMMENT
7
Press “BOOM OUT”
“BOOM OUT” is displayed.
Hydraulic system is activated and pressure gage
indicates max. 200 bar.
Boom moves as long as button is pressed. Ensure
that boom has reached its operating position.
8
Press “WINCH STOP”
The winch brake will engage and relieve the
servomotor from the load of the depressor weight.
The taut wire should never be left in “HOIST” mode
for more than a few minutes as the servo system
might trip due to overtemperature.
9
Press “WINCH LOWER”
“WINCH LOWER” is displayed.
Weight will descend at a speed of 1 m/s.
Wire length paid out will be displayed.
NOTE!
The joystick may override «WINCH LOWER».
Mooring light comes on as soon as weight has
reached seabed.
10
Check that mooring tension is as
required.
Adjust air pressure if necessary.
11
Press “BRIDGE CONTROL”
If “BRIDGE REMOTE CONTROL” is installed
(option).
“Bridge Control” is displayed.
To regain TW Control, press Local Control button.
12
Close and secure the Taut Wire Control
Panel door.