ENGLISH
17 / 36
0006160008_201711
VPS 504 VALVE TIGHTNESS CONTROL (IF PRESENT)
It checks the tightness of gas cut-off valves.
This check is carried out as soon as the boiler thermostat authorises
burner operation creating, by means of a membrane pump, an
overpressure greater than the upstream pressure by 20 mbar in the
test circuit.
If you wish to carry out a check, place a pressure gauge corresponding
to the PA pressure plug.
If the test circuit has a positive result, the LC authorisation lamp
(yellow) switches on after a few seconds.
In order to restart, it is necessary to unlock the equipment using the
LB light button.
The fuse can be accessed using a screwdriver to remove the cover
that is located near the sockets for electrical connection; a spare fuse
is located in the upper part of the tightness control, under the cap.
Summary of Contents for TBG 120 MC
Page 2: ......
Page 36: ...ITALIANO 34 36 0006160008_201711 SCHEMI ELETTRICI ...
Page 38: ......
Page 72: ...ENGLISH 34 36 0006160008_201711 WIRING DIAGRAMS ...
Page 74: ......
Page 75: ......