MAINTENANCE
Analyse combustion gases and check that the emission values are
correct at least once a year, in compliance with current law.
•
Clean air dampers, the air pressure switch with pressure port and
the relevant pipe, if any.
• Check the electrode condition. Replace them, if necessary.
• Clean the photocell. Replace it, if necessary.
•
Have the burner and the chimney cleaned by specialised personnel
(stove repairer); a clean burner is more efficient, lasts longer and
is quieter.
•
Check that the fuel filter is clean. Replace it, if necessary.
•
Check that all components of the combustion head are in good con
-
dition, have not been deformed and are free from deposits deriving
from the installation environment and/or from poor combustion.
•
In order to clean the combustion head, its outlet components must
be disassembled. Be careful during the reassembly operations
to exactly centre the gas diffuser with respect to the electrodes,
making sure that they are not earthed, which would result in the
locking of the burner. Verify also that the ignition electrode spark
takes place exclusively between itself and the drilled disk (see
combustion head and electrode disk distance regulation diagram)
for the version without pilot.
If the combustion head needs to be cleaned, remove the components
following the procedure indicated below:
•
Unscrew the four screws (6) and turn the burner around the pin
(10) in the hinge.
•
After pulling out the ignition and ionisation cables (14) from the ter
-
minals of the respective electrodes, unscrew completely the nut (9)
and tighten the screw (16), moving it forward inside the gas delivery
fitting (30) (figure 3), far enough to permit subsequent dismantling
of the mixing unit.
•
With the same wrench turn the ball joint (8) in the direction indica
-
ted by the arrow, unhooking the lever that moves the combustion
head forward.
6
0002934660a
fig. 1
10
ENGLISH
21 / 44
0006081328_202001
Summary of Contents for TBG 110 LX ME /V
Page 2: ......
Page 30: ...SCHEMI ELETTRICI ITALIANO 28 44 0006081328_202001 ...
Page 31: ...ITALIANO 29 44 0006081328_202001 ...
Page 32: ...ITALIANO 30 44 0006081328_202001 ...
Page 34: ...SCHEMI ELETTRICI ITALIANO 32 44 0006081328_202001 ...
Page 35: ...ITALIANO 33 44 0006081328_202001 ...
Page 36: ...D ITALIANO 34 44 0006081328_202001 ...
Page 37: ...BT1 BA BP I1 I2 I3 I4 ITALIANO 35 44 0006081328_202001 ...
Page 38: ...ITALIANO 36 44 0006081328_202001 ...
Page 39: ...E E ITALIANO 37 44 0006081328_202001 ...
Page 40: ...ITALIANO 38 44 0006081328_202001 ...
Page 41: ...ITALIANO 39 44 0006081328_202001 ...
Page 42: ...ITALIANO 40 44 0006081328_202001 ...
Page 43: ...ITALIANO 41 44 0006081328_202001 ...
Page 44: ...ITALIANO 42 44 0006081328_202001 ...
Page 46: ...ITALIANO 44 44 0006081328_202001 ...
Page 74: ...WIRING DIAGRAMS ENGLISH 28 44 0006081328_202001 ...
Page 75: ...ENGLISH 29 44 0006081328_202001 ...
Page 76: ...ENGLISH 30 44 0006081328_202001 ...
Page 78: ...WIRING DIAGRAMS ENGLISH 32 44 0006081328_202001 ...
Page 79: ...ENGLISH 33 44 0006081328_202001 ...
Page 80: ...D ENGLISH 34 44 0006081328_202001 ...
Page 81: ...BT1 BA BP I1 I2 I3 I4 ENGLISH 35 44 0006081328_202001 ...
Page 82: ...ENGLISH 36 44 0006081328_202001 ...
Page 83: ...E E ENGLISH 37 44 0006081328_202001 ...
Page 84: ...ENGLISH 38 44 0006081328_202001 ...
Page 85: ...ENGLISH 39 44 0006081328_202001 ...
Page 86: ...ENGLISH 40 44 0006081328_202001 ...
Page 87: ...ENGLISH 41 44 0006081328_202001 ...
Page 88: ...ENGLISH 42 44 0006081328_202001 ...
Page 90: ...ENGLISH 44 44 0006081328_202001 ...
Page 91: ......