Balluff BAE SA-FF-055-RS Quick Start Manual Download Page 7

www.balluff.com

3

english

Installation

Dimensional drawings

Fig. 4:  Dimensions in millimeters

Notes

Install device in a closable control cabinet rated at Pollution 
Degr

ee 2 and overvoltage category II and sufficient 

mechanical protection.

Protect device supply with a 1 A fast-acting fuse.

Protect relay circuit with a 1.6 A fast-acting fuse.

Protect device from mechanical damage.

Do not install device and cables in the vicinity of strong 
magnetic fields or cables carrying high currents.

To improve noise immunity with long cable runs use 
shielded cables.

The device meets the EMC requirements for industrial 
areas. Use in other areas may require additional EMC 
measures. To improve noise immunity with long cable runs 
use shielded cables.

To ensure sufficient ventilation maintain separation from 
adjacent intrinsically heating devices. Reducing the 
ambient temperature results in longer service life of the 
unit.

Snap the signal converter on to the rail from above. To 
remove, press the clamp on the underside.

Install connection cable according to the wiring diagram.

Install sensor according to the instructions in the 
corresponding user's guide.

Setting the switchpoint

General

The relay contact is closed when the yellow LED is on.
Set the switchpoint using the potentiometer on the front 
side of the device.
Keep the flow rate and medium temperature stable while 
setting and wait until the temperature between the sensor 
and medium has been compensated.
The flow rate must lie within the detection range of the 
sensor.

Monitoring a flow rate limit for undershoot or 
stoppage
1. 

Set flow rate and wait for the ready period.

2. 

Turn potentiometer counter-clockwise until the red LED 
comes on.

3. 

Turn potentiometer clockwise until the yellow and 
2 green LEDs come on. The relay contact is closed.

4. 

Reduce flow rate and observe the LEDs and switching 
output. When the yellow LED goes out the relay 
contact opens.

Monitoring a flow rate limit for overshoot
1. 

Set flow rate or stop flow and wait for the ready period.

2. 

Slowly turn the potentiometer screw clockwise until the 
yellow LED comes on.

3. 

Turn potentiometer counter-clockwise until the red LED 
comes on. The relay contact is open.

4. 

Increase flow rate. Also observe the LED indicators and 
switching output. When the limit value is exceeded, the 
yellow LED comes on and the relay contact closes.

Maintenance

Do not modify or repair the signal converter; repairs are to 
be performed only by the manufacturer.

Disposal

Observe the national regulations for disposal.

Signal converter for screw-in flow controllers
BAE SA-FF-055-RS

Summary of Contents for BAE SA-FF-055-RS

Page 1: ...nicht in explosionsgef hrdete Bereiche verlegt werden Das Auswerteger t ist eine Standardkomponente und keine Sicherheitseinrichtung nach MRL 2006 42 EG F r Sicherheitsapplikationen ist eine detaillie...

Page 2: ...zu sichern Allgemeine Sicherheitshinweise Vor Anschluss des Auswerteger ts die Anlage spannungs frei schalten Beachten Sie unbedingt die Sicherheitshinweise in dieser Anleitung und die beschriebenen...

Page 3: ...n Der Relaiskontakt ist geschlossen wenn die gelbe LED leuchtet Schaltpunkt mit dem Potenziometer in der Frontseite des Ger ts einstellen Str mungsgeschwindigkeit und Mediumtemperatur w h rend der Ein...

Page 4: ...nnung pr fen Durchfluss n derungen werden nicht angezeigt Betrieb des Sensors au erhalb der Spezifikationen oder Sensor falsch installiert Einsatzbedingun gen und Installa tion pr fen und ggf korrigie...

Page 5: ...eas The signal converter is a standard component and not a safety device per MRL 2006 42 EG For safety applications a detailed assessment of the applicability of the sensor including signal converter...

Page 6: ...against unauthorized use General safety notes Turn off power to the system before connecting the signal converter Always observe the safety instructions in this guide and the measures described to avo...

Page 7: ...ay contact is closed when the yellow LED is on Set the switchpoint using the potentiometer on the front side of the device Keep the flow rate and medium temperature stable while setting and wait until...

Page 8: ...ge Flow rate changes are not indicated Sensor operated outside of specifications or incorrectly installed Check conditions and installation and correct as needed Inverted response of the LED indicator...

Reviews: