BAK Thermoplastic Welding Technology AG
5
START UP OF THE WELDING MACHINE
1
2
3
4
5
6
7
8
Before connecting the tool to the mains supply please check, that:
the main switch is in position 0 OFF.
drive switch (5) is in position 0.
heating switches (2 and 8) are in position 0.
the hot air tools are in position: stand by (lifted up).
After:
Connect the tool to the mains.
Switch the main switch (1) to position 01 ON.
Turn the heating switches (2 and 8) to position ON.
The tool now heats up to the last selected set temperature.
To change the set temperature, check the section of the controller adjustment.
To get a constant quality of the welding seam, adjust the same set value on both controllers (3
and 7).