20
VIBE BACK TO W
ALL - installation
VIBE BACK TO WALL
(FREESTANDING)
INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 6 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © February 2019 BainUltra Inc. All rights reserved. 45200674
ELECTRONIC CONTROLS
1
ELECTRONIC CONTROL INSTALLATION – MIAPLUS
®
& MIAMULTI
®
2
ELECTRONIC CONTROL INSTALLATION – DOT
Jig saw with fine cut blade
Drill
1/4 in. drill bit
TOOLS REQUIRED
KEYPAD INSTALLATION
LOCATION:
Determine the most convenient location, on the wall close to tub.
WARNING
• Vibe Back to wall bath cannot be drilled for control installation.
DRILLING OF WALL:
Refer to the
Cutting Template on page 24
for the location and diameter of the holes.
IMPORTANT
• You will find the control attached to the turbine,
or to the electronic control modules.
7/8 in. Hole saw
Drill
DOT Chromatherapy (LED)
DOT WarmTouchShell
®
(WTS)
TOOLS REQUIRED
Drill wall (7/8” hole).
Push wiring through drilled hole.
Remove protective film from watertight seal.
Secure to the wall with permanent waterproof
sealant (mold-free clear silicone for bathrooms).
Secure temporarily with a tape for about 24 h.
KEYPAD INSTALLATION
WALL INSTALLATION
WALL INSTALLATION
Drill wall (template).
Remove the metal bracket not required
for wall mounting
Push wiring through drilled hole.
Remove protective film from watertight seal.
Secure to the wall with permanent waterproof
sealant (mold-free clear silicone for bathrooms).
Secure temporarily with a tape for about 24 h.