
4
controls user guide |
THE MIA
®
SERIES CONTROLS
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)
Printed in canada. copyright © January 2010 Bainultra inc. All rights reserved. 45220001
some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
T
H
E
M
IA
®
S
E
R
IE
S
C
O
N
T
R
O
L
S
MIa
®
& MIaplus
®
contRols
InstAllAtIon
determine the most convenient location, on either
the wall or the deck, to install the control module or
consult the specifications sheet for the suggested
location. to avoid drilling in an air intake zone or an
electric component, always check under the deck
before drilling. if you have to install the control to the
wall, remove the protective film of sticker behind the
control. You can add a silicone bead to secure it.
refer to the drilling template
on the last page
for the
location and diameter of the holes.
locAtion
drilling
instAlling the touchPAd
reQuired tools
1
Push wiring through drilled holes.
2
remove protective film from watertight
seal.
3
secure touchpad into place on either the
podium or the wall by using 2, 8-32 x 1”
studs and 2 wing nuts.
4
tighten sufficiently to insure seal is airtight.
1
Fine teeth jigsaw
2
drill
3
1/4 in. drill bit
• If control was not factory-installed,
it will be attached to the turbine.
wArnIng
MiA
®
& MiAPlus
®
controls - instAllAtion