INTRODUCTION
I-E96-419A
3 - 1
SECTION 3 - MAINTENANCE
INTRODUCTION
The translation termination unit (TTA) requires limited mainte-
nance. This section contains a maintenance schedule.
MAINTENANCE SCHEDULE
Execute the tasks in Table
at the specified intervals.
Table 3-1. Maintenance Schedule
Task
Interval
Clean and tighten all power and
field wiring connections.
Every 6 months or during plant
shutdown, whichever occurs first.
Use a static safe vacuum cleaner
to remove dust from:
Termination units.
Field termination panel.