
20
20
3. Install and tighten the 1/2-13 socket head bolts provided with the die. Tighten these bolts
enough to hold the die firmly down to the spindle. Approximately 30-40ft-lb. (40-50N
•m).
H
Spindle
I
Die Drive Pins
J
1/2-13 Tapped holes for bolting down dies
K
Center Pin
L
Hitch Pin
M
Positioning Bolts
4. To install the counter die, remove the hitch pin (L) and insert the counter die in the opening
in the counter die mount until the 3/4” holes line up.
5. Now insert the hitch pin through all the holes, reinstall clip on the hitch pin with the engraved
side of the counter die facing up.
6.
The counter die should be positioned approximately 1/8” (3mm) away from the die. This is
accomplished by a combination of the slide plate position and changing between the two
provided quick releases. See the Counterdie Placement Chart near the end of the manual.
7. In combination, install the recommended quick release (silver [shown] or gold) and then
position the slide plate in the recommended holes.
8. Tighten the two socket head bolts (M) to 200lbf ft. (27Nm).
NOTICE: The two 3/4-10 bolts hold the slide plate mechanism in place against the force
generated during bending.
J
H
I
K
L
M
Summary of Contents for RDB-150-AS
Page 17: ...14 14 GETTING TO KNOW YOUR MACHINE A B C D E F H I J K L G...
Page 38: ...35 35 RDB 150 ELECTRICAL SCHEMATIC...
Page 39: ...36 36 RDB 150 AS ELECTRICAL SCHEMATIC...
Page 46: ...43 43 Diagram 1...
Page 47: ...44 44 Diagram2...
Page 48: ...45 45 PARTS DIAGRAM Power Unit and Cart Assembly Parts Diagram...
Page 49: ...46 46 Main Tube and Cylinders Assembly Parts Diagram...
Page 50: ...47 47 Swing Arm Assembly Parts Diagram...
Page 51: ...48 48 Degree Dials Parts Diagram...
Page 56: ...53 53 Hydraulic System Parts Diagram...
Page 58: ...55 55 NOTES...
Page 59: ...56 56 NOTES...