27
27
PLASMA TABLE START-UP PROCEDURE
•
Verify that all cables are connected to the console.
•
MAKE SURE
all equipment is properly grounded. Consult a qualified electrician.
•
Verify that all components have the correct utilities connected both electrical and air.
(Consult individual operator’s manuals)
•
Check that the torch has the correct consumables for the amperage you will be running at.
Replace any torch consumable’s that appear damaged or distorted.
•
Be sure and connect the ground clamp from the torch power unit directly to the material
being cut.
•
Turn on the torch power unit. Set air pressure on the torch power unit per specifications in
the plasma cutter
operator’s manual.
Power up the control console:
1. Complete the connection of the console to the plasma table including connecting the console
to a 220V single phase power supply.
2. Twist the emergency stop button clockwise (
cw
) to reset.
3. Turn the rock switch to the
ON
position.
Checking motion of the servo motors:
1. From the Logo screen, press the ENTER key to enter the operating screen.
2. Use the Arrow keys to move the torch on the X and Y axis of the table.
3. Use the
“S
↑/
PgUp” and “S
↓/
PgDn” buttons to test the motion of the torch in the “Z” axis.
IMPORTANT:
See
Book 2 of 2 for detailed controller
operation.
Summary of Contents for PT-44AH-W
Page 43: ...41 41 ELECTRICAL DIAGRAM ...
Page 46: ...44 44 NOTES ...