background image

 

 

Force Majuere.

 Seller shall not be responsible for any delay in the delivery of, or failure to deliver, Goods due to 

causes beyond Seller’s reasonable control including, without limitation, acts of God, acts of war or terrorism, enemy 
actions, hostilities, strikes, labor difficulties, embargoes, non-delivery or late delivery of materials, parts and 
equipment or transportation delays not caused by the fault of Seller, delays caused by civil authorities, 
governmental regulations or orders, fire, lightening, natural disasters or any other cause beyond Seller’s reasonable 
control. In the event of any such delay, performance will be postponed by such length of time as may be reasonably 
necessary to compensate for the delay. 
 

Installation.

  If Buyer purchases any Goods that require installation, Buyer shall, at its expense, make all 

arrangements and connections necessary to install and operate the Goods. Buyer shall install the Goods in 
accordance with any Seller instructions and shall indemnify Seller against any and all damages, demands, suits, 
causes of action, claims and expenses (including actual attorneys’ fees and costs) arising directly or indirectly out 
of Buyer’s failure to properly install the Goods. 
 

Work By Others; Safety Devices.

  Unless agreed to in writing by Seller, Seller has no responsibility for labor or 

work performed by Buyer or others, of any nature, relating to design, manufacture, fabrication, use, installation or 
provision of Goods. Buyer is solely responsible for furnishing, and requiring its employees and customers to use all 
safety devices, guards and safe operating procedures required by law and/or as set forth in manuals and instruction 
sheets furnished by Seller. Buyer is responsible for consulting all operator manuals, ANSI or comparable safety 
standards, OSHA regulations and other sources of safety standards and regulations applicable to the use and 
operation of the Goods. 
 

Remedies.

  Each of the rights and remedies of Seller under this Agreement is cumulative and in addition to any 

other or further remedies provided under this Agreement or at law or equity. 
 

Attorney’s Fees.

  In the event legal action is necessary to recover monies due from Buyer or to enforce any 

provision of this Agreement, Buyer shall be liable to Seller for all costs and expenses associated therewith, 
including Seller’s actual attorney fees and costs. 
 

Governing Law/Venue.

  This Agreement shall be construed and governed under the laws of the State of 

Wisconsin, without application of conflict of law principles. Each party agrees that all actions or proceedings arising 
out of or in connection with this Agreement shall be commenced, tried, and litigated only in the state courts sitting in 
Manitowoc County, Wisconsin or the U.S. Federal Court for the Eastern District of Wisconsin. Each party waives 
any right it may have to assert the doctrine of “forum non conveniens” or to object to venue to the extent that any 
proceeding is brought in accordance with this section. Each party consents to and waives any objection to the 
exercise of personal jurisdiction over it by courts described in this section. Each party waives to the fullest extent 
permitted by applicable law the right to a trial by jury. 
 

Summary of Return Policy. 

  10 Day acceptance period from date of delivery. Damage claims and order discrepancies will not be accepted 

after this time. 

  You must obtain a Baileigh issued RGA number PRIOR to returning any materials. 

  Returned materials must be received at Baileigh in new condition and in original packaging. 

  Altered items are not eligible for return. 

  Buyer is responsible for all shipping charges. 

  A 30% re-stocking fee applies to all returns. 

 
Baileigh Industrial makes every effort to ensure that our posted specifications, images, pricing and product 
availability are as correct and timely as possible. We apologize for any discrepancies that may occur. Baileigh 
Industrial reserves the right to make any and all changes deemed necessary in the course of business including but 
not limited to pricing, product specifications, quantities, and product availability. 
 

For Customer Service & Technical Support: 

Please contact one of our knowledgeable Sales and Service team members at: 
(920) 684-4990 or e-mail us at [email protected] 

Summary of Contents for MSS-14F

Page 1: ...GH INDUSTRIAL INC IS PROHIBITED Baileigh Industrial Inc does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulting fro...

Page 2: ...ATIONS 8 TECHNICAL SUPPORT 8 UNPACKING AND CHECKING CONTENTS 9 Cleaning 9 TRANSPORTING AND LIFTING 10 INSTALLATION 10 Anchoring the Machine 11 GETTING TO KNOW YOUR MACHINE 12 ASSEMBLY AND SET UP 13 To...

Page 3: ...e to Seller of any suspected defect in the Goods prior to the expiration of the warranty period The original end user must also obtain a RGA from Seller prior to returning any Goods to Seller for warr...

Page 4: ...or further remedies provided under this Agreement or at law or equity Attorney s Fees In the event legal action is necessary to recover monies due from Buyer or to enforce any provision of this Agree...

Page 5: ...Description of the functional parts of the machine Capacity charts Setup and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remo...

Page 6: ...zardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a h...

Page 7: ...ECT AGAINST NOISE Prolonged exposure to loud noise can cause impairment or loss of hearing Wear suitable hearing protective devices such as ear muffs or earplugs to protect against objectionable or un...

Page 8: ...igh does not recommend or endorse making any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or other...

Page 9: ...ore using any tool or machine carefully check any part that appears damaged Check for alignment and binding of moving parts that may affect proper machine operation 15 Observe work area conditions DO...

Page 10: ...k for purchased machines Tech Support handles questions on machine setup schematics warranty issues and individual parts needs other than die sets and blades For specific application needs or future m...

Page 11: ...ge painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease for prot...

Page 12: ...er gently to the floor Level the machine so that all the supporting feet are taking the weight of the machine and no rocking is taking place INSTALLATION IMPORTANT Consider the following when looking...

Page 13: ...certain that the floor is capable of supporting the weight of the machine work stock and the operator The floor should also be a level surface If the unit wobbles or rocks once in place be sure to el...

Page 14: ...al Press treadle the pedal to clamp and release the jaws B Connecting Linkage Connects the foot pedal to the rocker arm to activate the clamping and releasing action for the dies C Gap Adjustment Incr...

Page 15: ...ing X is pointing toward each other in both the top and bottom die sets Also notice that the screw heads A point away from the material gap B WARNING For your own safety DO NOT connect the machine to...

Page 16: ...ie assemblies removed so you can see the jaw orientation The jaws with serrations are to be used for shrinking In this view it will shows how to remove the jaw caps Insert a screw driver into the mach...

Page 17: ...from the magnet is released grab onto the assembly and remove In this view it shows the jaws installed for stretching Note that the markings U are now pointing together This is the reversing of the j...

Page 18: ...w block assemblies should be lightly lubricated so that they will slide freely and evenly Use a 40 weight motor oil or similar Clean the blocks regularly to prevent them from collecting dirt and becom...

Page 19: ...retch sheet metal up to 14ga 1 9mm The principal operation is made when the sheet work piece is placed between the jaws and then applying and releasing force with the foot on and off of the foot pedal...

Page 20: ...il Material should have a smooth surface so it processes easily Dimensional properties of material must be consistent and not exceed the machine capacity values Chemical structure of material must be...

Page 21: ...te threaded components and sliding devices Apply rust inhibitive lubricant to all non painted surfaces Note Proper maintenance can increase the life expectancy of your machine WARNING Make sure the el...

Page 22: ...20 20 PARTS DIAGRAM...

Page 23: ...21 21...

Page 24: ...22 22...

Page 25: ...23 23...

Page 26: ...14 PS16 6A013 Jaw Insert 2 15 PS16 7A011 Special Washer 4 18 MS16 6A006 Angle Bracket 2 19 MS16 6A010 Shrinker Stand R H 1 20 MS16 6A009 Shrinker Stand L H 1 21 PP 1537 1 25 ID X 1 50 OD X 2 0 Bushing...

Page 27: ...ning Ring 4 45 STD Straight Grease Zerk 7 46 M16 X 2 0 X 30 Hex Flange 2 47 M12 X 1 75 X 40 Hex Flange 4 48 M12 X 1 75 X 30 Hex Flange 2 49 M12 X 1 75 X 35 Hex Flange 2 50 STD 1 14 Lock Nut 4 51 M10 X...

Page 28: ...4 www baileigh com BAILEIGH INDUSTRIAL INC 1455 S CAMPUS AVENUE ONTARIO CA 91761 PHONE 920 684 4990 FAX 920 684 3944 BAILEIGH INDUSTRIAL LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WES...

Reviews: