Baicells Neutrino430 Installation Manual Download Page 20

 

20

 

 

 

3.5.3.2  

 

LGW 

The Local GateWay (LGW) setting must be configured when using the Baicells CloudCore 
Evolved Packet Core (EPC). Refer to Figure 3-14 and Table 3-2. You must reboot the eNB when 
you make changes to these settings. 
 

Figure 3-14: LGW 

 

 

Table 3-2: LGW 

Field Name   

Description   

LGW 

On or Off 

LGW Mode 

Select an option: 

 

NAT: Packages from  the  internal network to the  external network need 
Network Address Translation   

 

Router: Select optimized route from the routing table (Figure 3-15) 

 

Bridge: Transfer in the data link layer 

LGW Interface Binding  The IP address connects to the LGW. Select from configured interfaces. 

Default is WAN interface, the VLAN interface can also be used to separate 
different links. 

LGW IP Pool 

Enter the starting IP address of the dynamic IP address pool 

LGW IP Pool Netmask 

For example, if the first IP address is 10.10.10.1, and the netmask is 
255.255.255.0, the IP address pool includes 255 IP addresses. The options 
are shown in the pull-down menu: 

 
 
 
 
 

 

 

Static Address 

If LGW Mode = Router (Figure 3-15), set to ON if you want to use a static IP 
address. 

Summary of Contents for Neutrino430

Page 1: ...Neutrino 430 Indoor 4x250mW Two Carrier TDD eNodeB Installation Guide BaiBS_QRTB_2 5 4 January 2021 Version 1 02...

Page 2: ...ation in this document is subject to change at any time without notice For more information please consult with a Baicells technical engineer or the support team Refer to the Contact Us section below...

Page 3: ...that could cause bodily injury Before you work on any equipment be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents Warning Rea...

Page 4: ...aul Configuration 13 3 3 2 PWR Power Supply WAN PoE Backhaul Configuration 14 3 3 3 WAN PoE Power Supply and Backhaul Configuration 15 3 4 Power on to Check LED Status 15 3 5 Configure Basic Parameter...

Page 5: ...3 8 WAN PoE and Power Supply Backhaul Configuration 15 Figure 3 9 Check LEDs 15 Figure 3 10 GUI Login 16 Figure 3 11 Home Page Example is a lab Neutrino 430 17 Figure 3 12 Configuration Flow 18 Figur...

Page 6: ...ad zones Figure 1 1 Neutrino 430 eNB The network structure of the Neutrino 430 is shown in Figure 1 2 Figure 1 2 Network Structure As a two carrier eNB the Neutrino 430 hardware unit contains two sepa...

Page 7: ...operators who have limited licensed spectrum or who are planning to use the second carrier later as their network grows In SC mode only the primary cell Pcell aka Cell 1 is used CA provides the abili...

Page 8: ...a configurable parameter using special Subframe Assignment SA o 2x20 MHz per carrier SA1 DL 80 Mbps UL 28 Mbps SA2 DL 110 Mbps UL 14 Mbps o 2x10 MHz per carrier SA1 DL 40 Mbps UL 14 Mbps SA2 DL 55 Mb...

Page 9: ...on 2 1 Installation Tools Check the Neutrino 430 package to ensure it contains everything on the packing list enclosed with the product In addition to industry standard tools you will need the tools d...

Page 10: ...twork used for data backhaul 2 3 Location Environment The Neutrino 430 can be installed on a ceiling or a wall For the best signal coverage place the eNB in an unobstructed location In addition to net...

Page 11: ...s below Step 1 Open a web browser and enter the CloudCore address Figure 2 2 https cloudcore cloudapp net cloudcore Step 2 Click on the Sign up button Step 3 Complete the mandatory fields and again cl...

Page 12: ...ast 5 kg If the ceiling is made of drywall or gypsum it must be reinforced before installation to ensure the eNB is secure 1 Fit the installation bracket on the ceiling or wall as shown in Figure 3 2...

Page 13: ...ower supply OPT backhaul PWR power supply WAN PoE backhaul WAN PoE power supply and backhaul 3 3 1 PWR Power Supply OPT Backhaul Configuration Connect the cables for the PWR power supply OPT backhaul...

Page 14: ...figuration as shown in the following steps Refer to Figure 3 7 1 Connect the AC power supply to the power PWR interface on the eNB and the other end to a power outlet 2 Connect the Ethernet cable to t...

Page 15: ...er end of the Ethernet cable to the PoE port on the LAN switch 4 Connect another Ethernet cable to the Ethernet port on the LAN switch 5 Connect the other end of the Ethernet cable to the Ethernet por...

Page 16: ...wing documents on the Baicells website Baicells Support Documents CloudCore Configuration Network Administration Guide OMC BOSS CPE Configuration Guide eNB Configuration Guide Carrier Aggregation Dual...

Page 17: ...page is the BTS Info Basic Info menu which reports the current eNB status Figure 3 11 In section 3 5 7 you will use this page to confirm that the eNB is active Figure 3 11 Home Page Example is a lab N...

Page 18: ...twork Management System NMS in most cases the CloudCore OMC and the Mobility Management Entity MME If not using CloudCore the eNB s NMS may be a Local OMC or the LTE NMS All of the Internet WAN fields...

Page 19: ...Enabled Used to enable the interface Four IP addresses are the maximum number the eNB supports Connect Via Used to select the desired interface protocol DHCP Static IP IPv6 DHCP or IPv6 Static IP Cur...

Page 20: ...imized route from the routing table Figure 3 15 Bridge Transfer in the data link layer LGW Interface Binding The IP address connects to the LGW Select from configured interfaces Default is WAN interfa...

Page 21: ...to bind an IMSI number to the IP address enter the IMSI number IMSI to IP Binding IP If LGW Mode Router and Static Address ON Figure 3 15 enter the IP address to bind to the IMSI You can add more than...

Page 22: ...re the Management Server In the BTS Settings Management Server window you will enter the network management service NMS information Figure 3 17 When using the Baicells CloudCore to manage the network...

Page 23: ...you must configure and or verify First if the operator is using the Baicells CloudCore EPC you must enter a fixed PLMN and MME IP address PLMN 314030 MME IP 10 3 0 9 and 10 5 0 9 Do not change these...

Page 24: ...purchased Single carrier no CA means only Cell 1 will operate and use only 2 RF ports instead of 4 Operators may need to use this mode if they have limited spectrum or are planning to change to CA or...

Page 25: ...us using the eNB GUI and the OMC eNB GUI Go to BTS Info Basic Info and check the Cell Status field Figure 3 20 It should show Active Also check that GPS Sync is reported as Synchronized OMC Go to eNB...

Page 26: ...26 Figure 3 20 Cell Status eNB GUI...

Page 27: ...twork Timing Protocol NTP and configure additional features if needed For help refer to the Baicells CloudCore Configuration Network Administration Guide Before commercial operation Baicells recommend...

Page 28: ...io communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Warni...

Reviews: