![Baicells Neutrino430 Installation Manual Download Page 13](http://html1.mh-extra.com/html/baicells/neutrino430/neutrino430_installation-manual_3455601013.webp)
13
4.
Tighten the screws on the top of the bracket using a cross screwdriver to complete the
installation (Figure 3-5).
Figure 3-5: Screw Location on the Bracket
3.3 Connect Cables
The power and interface cables for the Neutrino-430 can be connected in three different
configurations depending on your specific site requirements or setup:
•
PWR
power supply,
OPT
backhaul
•
PWR
power supply,
WAN/PoE+
backhaul
•
WAN/PoE+
power supply and backhaul
3.3.1 PWR Power Supply, OPT Backhaul Configuration:
Connect the cables for the
PWR
power supply,
OPT
backhaul
configuration, as shown in the
following steps. Refer to Figure 3-6:
1.
Connect the AC power supply to the power (PWR) interface on the eNB and the other
end to a power outlet
.
2.
Connect the optical fiber cable to the optical (OPT) interface on the eNB.
3.
Connect the other end of the optical fiber cable to the Ethernet port on the Ethernet
switch.