Before putting into operation
Page 2
LM_OG-AM_BA_02_1163
May 2019
Repair of faults
Disconnect all units from power supply and have it repaired by a qualified service person if any of the following occurs:
WARNING
Failure to adhere to these safety
instructions may result in damage to the
product or serious bodily injury.
RoHs
Our products are RoHs compliant.
Battery disposal
The batteries contained in our products need to be disposed of as per your
local legislation acc. to EU directive 2006/66/EG.
3.
BEFORE PUTTING INTO OPERATION
Please check that the technical data of the installation match with those of the lube meter, for example connections, pressure,
flow range and medium. Once the meter has been installed, please make sure that
no
air, pressure shocks or particles
can
damage the meter.
Read the following information and have a thorough understanding before proceeding with meter installation. Only
qualified personnel should perform meter installation.
•
Install a strainer or Y or basket as close to the inlet side of the meter as possible. Strainers prevent dirt and other fluid
contaminants from impeding meter performance. Strainers require periodic cleaning, as clogged strainers also impede
meter performance. Contact your local representative for specific information, per your specific application.
Figure 1:
Meter installation
!
Strainer
Strainer
Flow direction