PRE-INSTTLLTTION CHECKLIST
Charged Battery
Charge the battery for four hours with the flow meter turned OFF .
Tools Not Included with the Flow Meter
• A 5/16 in . nut driver or a flat-head screwdriver
• Permanent marker or other utensil that will make a visible mark on the pipe
• Tape for larger pipe configuration, Z-mode
• Scissors for larger pipe configuration, Z-mode
• Rag or paper towels
Prepared Mounting Trea for Transducers
• The pipe surface where the transducers are to be mounted must be clean and dry .
• Remove scale, rust or loose paint to provide satisfactory acoustic conduction .
• Wire brush the rough surfaces of pipes to smooth bare metal .
• Plastic pipes do not require preparation, other than cleaning .
Pre-Installation Checklist