background image

1.0/0205

STEP 1:

 See PICTURES 1A and 1B.

Using FOUR 2” SCREWS (A), attach the BOT-

TOM BACK RAIL (C) and BOTTOM FRONT RAIL
(D) to the TWO SIDE FRAMES (B).

The “dimples” on metal side frames should face

out so the screws heads will be flush against the surface
when screwed in (Picture 1A).

STEP 2:

 See PICTURE 2.

Check the BUMPER/LINER (E) for a small hole

at the top middle of one of the long edges. This indi-
cates the TOP BACK RAIL (F).

Using FOUR 2” SCREWS (A) Attach the TOP

BACK RAIL (F) and TOP FRONT RAIL (G) to the
SIDE FRAMES (B). Be sure the top back rail (F) is
attached on the same side as the bottom back rail (C).

STEP 3:

 See PICTURES 3A AND 3B.

Put the BOTTOM PLATFORM BOARD (H)

into the bassinet and adjust the fabric so the board is
pushed down as far as possible to the bottom.

Using  FOUR 1¾” BOLTS (I), FOUR WASH-

ERS (S), and FOUR T-NUTS (R), secure the BOARD
(H) to the BOTTOM RAILS (C, D).

Slip a WASHER (S) onto each bolt. Then as

illustrated in PICTURE 3B, the BOLTS (I) go down
through the pre-drilled holes on the BOARD (H),
through the FABRIC LINER (E) (make holes in the liner
as necessary), and RAILS and screw into T-NUTS (R)
that you insert into the holes on the bottom edges of the
RAILS (C, D).

Screw the bolts into the T-Nuts so all the parts

and layers are tight and flush against each other.

Page 2 of  4

PICTURE 2

B

E

G

C

D

B

PICTURE 1B

PICTURE 1A:

Side view close-up

of the dimple on

the metal tube for

screw head.

Small hole in fabric

F

B

B

PICTURE 3A - Inside View

E

H

Reviews: