![Backyard Brookdale 2006522B Assembly Instructions Manual Download Page 30](http://html.mh-extra.com/html/backyard/brookdale-2006522b/brookdale-2006522b_assembly-instructions-manual_465176030.webp)
Phase
2
Ǣǻrƻ
7
SCREWS GO THROUGH EDGE TRIM AND INTO
THE TOP OF THE RIBS IN THE APPROXIMATE
LO
CA
TIONS SHOWN.
TIPS:
DUE TO MULITPLE LAYERS OF METAL ON THE
EDGE TRIM. IT IS RECOMMENDED THAT A 1/8"
DRILL BIT IS USED TO CREATE STARTER HOLES.
FLUSH
SLIP EDGE TRIM INTO SPLICE.
ENSURE THAT BOTH ENDS ARE
FLUSH WITH THE EDGE OF
ROOF PANELS.
30