Phase 1
Ǣǻrƻ
9
TIPS
•
SQUARE EACH ROOF PANEL.
MEASURE FROM CORNER TO CORNER AS SHOWN AND ENSURE THE MEASUREMENT IS THE SAME IN EACH DIRECTION.
THEN INSTALL THE E3 & E4 BOARDS AS SHOWN.
11'-3 7/16" [3440 mm]
APPROXIMATELY
22
Page 1: ...ackyarddiscovery com SAVE THIS ASSEMBLY MANUAL FOR FUTURE REFERENCE IN THE EVENT THAT YOU NEED TO ORDER REPLACEMENT PARTS Para obtener instrucciones en espariol visite www backyarddiscovery com Made in China INS 2006522 A BROOKDALE ENG 12 03 2019 Made in China INS 2006522B A 12x10 BROOKDALE GAZEBO ENG 11 5 2021 Manufactured by Backyard Discovery 3305 Airport Drive Pittsburg KS 66762 800 856 4445 E...
Page 2: ...d bend dent or scratch 12 1 _ 3683 mm 40 N IIIIIIIIII 4i __7__ ___ I _ ___ 1 fi fi 1 4 9 11 2 3 16 15 8 3 16 10 0 0 3408 mm 4781mm 3048 mm W V I N I ____4 I I fi fi 9 12 1 3683 mm I I 10 4 1 8 8 9 3 16 9 9 3 16 3153 mm 2672 mm 2976 mm 7 4 3 8 2245 mm a 9 9 3 16 10 9 1 8 2976 mm I 3280 mm I TI 10 Owner s Manual Basic Setup Dimensions Assembly Notes Pay close attention to the items needed for each s...
Page 3: ...3 1 m 10 9 3 8 3 3 m 9 8 7 8 3 m 9 9 3 8 3 m 9 3 1 8 2 8 m 8 9 2 7 m 13 9 7 8 4 2 m FO O T CENTER TO FO O T CENTER 13 1 1 2 4 m FO O T CO R NER TO FO O T CO RNER 3 3 8 in 86 mm 3 3 8 in 86 mm 1 3 4 in 43 mm 1 3 4 in 43 mm 4 ANCHORS PER POST 3 ...
Page 4: ...2 1 3 8 x5 1 4 x11 1 2 36x134x292 D3 4 BEAM W4L13075 1 3 8 x5 1 4 x102 3 8 36x134x2600 D4 2 ANGLE BRACE W4L13071 1 3 8 x5 1 4 x30 1 4 36x134x769 D6 4 ANGLE BRACE W4L13082 1 3 8 x5 1 4 x32 3 8 36x134x823 D7 4 OUTSIDE RAFTER W4L13076 1 3 8 x3 3 8 x77 3 8 36x86x1965 E1 4 RAFTER W4L13073 1 3 8 x3 3 8 x77 3 8 36x86x1965 E2 6 ANGLE BRACE W2A02968 1 5 16 x6 7 16 x35 3 4 34x163x908 AB2 7 ANGLE BRACE W2A03...
Page 5: ...H1 2 FASCIA W4L13078 1 x3 3 8 x59 3 8 24x86x1507 H2 4 END RAFTER W2A02962 2 13 16 x5 1 4 x80 5 8 72x134x2048 RP1 2 POST W2A02963 6 x6 x92 1 16 152x152x2338 P1 2 POST W2A02965 7 x7 x32 1 2 152x152x845 P3 2 END RAFTER W2A02966 2 13 16 x5 x80 5 8 72x134x2048 RP2 2 POST W2A02964 6 x6 x92 1 16 152x152x2338 P2 2 RIDGE CAP STIFFENER W4L13590 1 x2 3 8 x47 5 8 24x60x1210 J9 2 RIDGE CAP STIFFENER W4L13591 1...
Page 6: ...WH BLK x18 5 16x2 1 2 H100193 NUT BARREL WH BLK x42 I5 16x1 1 2 H100205I BOLT WH BLK x42 I 5 16x2 1 4 H100192I NUT BARREL WH BLK x70 I 5 16x7 8 H100407I BOLT WH BLK H100379IT NUT BLK x13 5 16x11 2 x26 I 5 16 H100459 BOLT WH BLK H1002061LAG SCREW WH 5 16x3 BLK I x18 5 16x1 1 4 22 H100468I BOLT WH BLK H100471 LAG SCREW WH BLK I x9 I 5 1 6x1 x54 5 16x1 1 2 13 Owner s Manual Parts Identification 6 ...
Page 7: ...8x19 x92 H100198 WASHER FLAT BLK 8x19 x17 H100630 SCREW PWH BLK 8x3 4 x17 H100392 NUT LOCK BLK 5 16 x4 H100479 WASHER FLAT BLK 5 16 x4 H100770 SCREW WOODGRIP 10x3 4 x17 H100833 TORX BIT T 40 x1 A100042 TORX WRENCH T 40 x1 A100041 SCREW SETTER x1 H100764 SCREW TAPPING 1 4x3 4 x17 H100759 SCREW WOODGRIP 10x1 1 4 x132 H100760 SCREW CONCRETE ANCHOR 1 4x2 x18 H100120 TORX BIT T 30 x1 H100147 TORX WRENC...
Page 8: ...omponents Not to Scale Parts Identification BYD ID TAG SMALL WITHOUT AGES x1 A100241 ROOF BRACKET x6 A4M00961 L BRACKET 66x66x127 BLK x4 A4M00619 BRACKET x4 A4M00972 BRACKET x2 A4M00973 BRACKET x4 A4M00979 BRACKET x4 A4M00974 8 ...
Page 9: ...cale EE ED POST PLATE A4M x 0 8 0 978 I A4M00977 x8 I POST ANCHORING PLATE 1 11 lf t I i ill i _____ t qp p 0 0 4 11e A6P00308I 6x6 POST FOOT x4 6 111 00 611 0 li e A6P00265I ELECTRICAL OUTLET KIT PATENT PENDING 1 A6P00171 x ISTAIN MARKER 16 Owner s Manual Parts Identification 9 ...
Page 10: ...o Scale A4M0 124129 GA STEEL SHEETING x8 1 A4M011161 RIDGE CAP 29 GA x2 A4M 0 01 127 RIDGE CAP SPLICE A6P00398I RIDGE CAP PROTECTOR x2 A4IV I 4 0 982I ROOF EDGE TRIM 00 983I ROOF EDGE TRIM SPLICE A4M x 17 Owner s Manual Parts Identification 10 ...
Page 11: ...ound on the flat surface of the boards or on the end of the boards Allow yourself plenty of room the wood pieces can take up a significant amount of space HARDWARE PARTS We recommend that you have a separate table to organize the hardware Hardware bags are printed with a seven digit alpha numeric part number You can organize your hardware by part number or group by hardware type i e bolts nuts etc...
Page 12: ...ts Phillips Head Rubber Mallet Optional Tape Measure Claw Hammer 1 8 3 16 3 8 7 16 Drill Bits 3 8 Drive Ratchet 1 2 7 16 STD Sockets 1 2 7 16 Deep Sockets Cordless Drill or Electric Drill 3 8 5 16 Nut Drivers QUICK RELEASE BAR CLAMP A6P00460 2 PRE ASSEMBLY STEP 2 Tools Required 12 ...
Page 13: ...ilable to you 1 Printed Assembly Manual included with your set 2 BILT APP 3D interactive instructions 3 Combination of the Printed Manual and BILT APP Note Step numbers can differ between the two methods PRE ASSEMBLY STEP 3 Choose Your Assembly Method 13 ...
Page 14: ...x6 POST FOOT X4 H100200ISCREW PFH BLK P2IPOST W2A020610 x16 8x1 1 2 2 6 x6 x92 1 16 152x152x2338 COMPLETE THIS STEP TWICE v TIP FOR EASE OF ASSEMBLY WE RECOMMEND USING SAW HORSES FOR STEPS 1 THROUGH 3 PI xv POST 308 x2 6x6 POST FOOT 200 x8 SCREW 1 1 2 P2 xv POST 18 Phase 1 STEP 1 14 ...
Page 15: ...H BLK H100471 x8 1 5 L A 1 G 6x1C 1 72 EW WH BLK H1 0 8 0 198W 8 WASHER LOCK EXT BLK NOTE COMPLETE THIS STEP TWICE READ ALL THE NOTES BEFORE YOU BEGIN EACH STEP c 4 Z 52 FACE HOLES INWARD P3 xl ON EACH POST D2 xi POST 0 BEAM P1 J D2 x BEAM 972 x2 BRACKET D2 xt o 471 x BEAM LAG SCREW 1 1 2 NOTE D2 x7 PILOT HOLES FACE DOWN BEAM o T 1930a2 NUT BARREL 11 2 P2 974 x2 BRACKET I I 198 x4 N F __ WASHER 8x...
Page 16: ...8 1 5 16 x6 7 16 x35 3 4 34x163x908 AB2 7 LAG SCREW WH BLK 5 16x3 8 H100206 BOLT WH BLK 5 16x2 1 4 16 H100205 NUT BARREL WH BLK 5 16x7 8 16 H100192 WASHER LOCK EXT BLK 12x19 16 H100199 WASHER LOCK EXT BLK 8x19 24 H100198 Dˢ ʹɮˠʺ ŗµĵr DNJ Nr ON ONE SIDE ONLY Dˡ ʹɮˢʺ ŗµĵr DNJ Nr ˠ ʹɮˣʺ ɟ ǢËrNJ ɮˠ ˡ ʹɮˣʺ ĵ µ ǢNNJrɟ ˢ ANGLE BRACE W2A03470 1 5 16 x6 7 16 x35 3 4 34x163x908 AB3 1 16 ...
Page 17: ...LK I x8 5 16x7 8 x8 I 12x19 199 x8 WASHER 12x19 192 xs NUT BARREL 7 8 468 x8 BOLT WH 1 D4 xv BEAM D4 xi BEAM 00 00 21 Phase 1 Ǣǻrƻ 4 TIPS THREE PEOPLE ARE HELPFUL FOR THIS STEP MOVE THE 10FT POST ASSEMBLIES TO THEIR FINAL LOCATION WITH SOMEONE HOLDING EACH ASSEMBLY UPRIGHT USING A THIRD PERSON CONNECT THE BEAM TO THE POSTS TO MAKE THE GAZEBO FRAME 17 ...
Page 18: ... BLK H100199I WASHER LOCK EXT BLK x4 13 8 X5 1 4 X11 1 2 36x134x292 x4 x16 5 16x1 1 2 x16 12x19 NOTE ALIGNHOLES INPLATE WITHHOLES IND1 D3 199 x16 BOARDS AND MOUNT WASHER 12x19 N N 193 x16 NUT BARREL 1 1 2 0 0 D3 xv D3 x D1 x7 BEAM BEAM BEAM 354 x16 z BOLT 6 1 2 D1 xo 979 x4 BEAM BRACKET D3 xI Ol BEAM D3 xi BEAM 22 Phase 1 Ǣǻrƻ 5 ALIGN HOLES IN PLATE WITH HOLES IN D1 AND D3 BOARDS AND MOUNT 18 ...
Page 19: ... 15 16 x6 7 16 x35 3 4 34x163x908 H100198 WASHER LOCK EXT BLK H100199I WASHER LOCK EXT BLK I x24 8x19 x16 I 12x19 199 x76 192 x16 WASHER 12x19 NUT BARREL 7 8 198 x16 WASHER 8x19 205 x76 BOLT 2 1 4 AB1 x8 ANGLE BRACE 198 x8 WASHER 8x19 206 x8 LAG SCREW 3 I 23 Phase 1 Ǣǻrƻ 6 CRITICAL SQUARE UNIT BEFORE PROCEEDING TO NEXT STEPS ONCE SQUARE TIGHTEN ALL HARDWARE 19 ...
Page 20: ... EXT BLK H100198IWASHER LOCK EXT BLK M 100379IT NUT BLK 8 12x19 4 8x19 8 5 16 COMPLETE THIS STEP ON BOTH SIDES 7 NOTE ALIGN PILOT HOLES WITH POST HOLES BY 1 TEMPORARILY INSTALLING THE LONG 9 1 2 BOLTS H100829 BEFORE INSTALLING SCREWS o cs17 o RP1 x END RAFTER RP2 x1 201 x2 END RAFTER _ SCREW 2 1 2 ____ _ RP2 x1 END RAFTER D6 x2 ANGLE BRACE o 192 x4 ANGLE BRACE NUT BARREL 7 8 o RP1 x o 199 x4 END R...
Page 21: ... 8 24x86x2670 4 1 x3 3 8 x59 3 8 24x86x1507 30 I H100391SCREW 8 PFHBLK COMPLETE THIS STEP TWICE H1 x Thl I I RAFTER _ IIMIIIIIIINE E1 x1 OUTSIDE RAFTER _ E1 xi OUTSIDE RAFTER _ E2 x3 _ _ _ RAFTER NOTE JOINT ___ J H2 x7 H2 xi FASCIA FASCIA A SIDE VIEW ALIGN PILOTHOLES ON BOTHENDS 391 x o SCREW 2 391 x5 SCREW 2 200 x5 l SCREW 1 1 2 _ D E2 x3 RAFTER El x2 OUTSIDE RAFTER RAFTER H2 x2 FASCIA 25 Phase 1...
Page 22: ...SURE FROM CORNER TO CORNER AS SHOWN AND ENSURE THE MEASUREMENT IS THE SAME IN EACH DIRECTION THEN INSTALL THE E3 E4 BOARDS AS SHOWN E3 4 4 villoolillft _ vr E4 allikb gala _ V E4 Illiblob qsIIIIIIIIIIMIIIIIIIIIIII ii E3 p1 4ppRox 11 31i16 3440 mm E3 _ ______ s WAVY T E4 Vi N1 v _ E4 r 1 00 0 I s E3 4 i 391 x20 SCREW 2 379 x8 T NUT 5 16 _ 198 x8 WASHER 8x19 459 x8 BOLT 1 1 4 26 Phase 1 Ǣǻrƻ 9 TIPS ...
Page 23: ... step Assemble each roof panel by starting on the right side and working toward the left as shown POSITION YOUR ROOF PANELS ON THE GROUND SO THEY MIRROR EACH OTHER AS SHOWN REMOVE PROTECTIVE BLUE FILM FROM PANELS till 2 1 2 in 63 mm I 1 RIDGE NOTE HOLE LOCATIONS GO TOWARDS THE PEAK OF THE ROOF II I I I I 4m Ili 27 Phase 2 PREPARATION 2 1 2 63 mm NOTE HOLE LOCATIONS GO TOWARDS THE PEAK OF THE ROOF ...
Page 24: ... THRUHOLES SQUARE BEFORE MOVING ON NOTERIB OVERLAP NOTE THE TWO RIDGE CAP HOLES INEACH SHEET ___ THEIR ORIENTATION 1 124 x2 29 GA STEEL SHEETING n I I i l l I I SHEATHING BOARD 1 I I I I il I MM I AS FLUSH SHEETING 28 Phase 2 STEP 1 5 16 8 mm 1 8 3 mm HOLD SHEETING INSIDE OF FRAME NOTE THRU HOLES NOTE RIB OVERLAP FLUSH SHEETING NOTE THE TWO RIDGE CAP HOLES IN EACH SHEET AND THEIR OREINTATION MAKE ...
Page 25: ...l e Os Phase 2 STEP 2 1 1 760110 16x1 1 4 WOODGRIP SCREW MIIIIMINI 760 x24 4 SCREW 11 4 v _ viiilli IIIIIIIIIIIIIIIN 1 V 11 1 0 0101100 SHEATHING BOARD 101 1 111 1 111 11 1 111 1110 1 29 Phase 2 STEP 2 25 ...
Page 26: ...D SHEETING INSIDE OF FRAME 1 1 760 x32 SCREW 1 1 4 NOTE HOLE LOCATIONS asdkimiesimi111111 1111111 _ NOTERIB OVERLAP 124 x2 7 29 GA STEEL SHEETING lli 7 V SA 10 01111111 iiiii111111 FLUSH SHEETING 30 H x 1 30 12 0 7 6 Phase 2 STEP 3 1 8 3 mm HOLD SHEETING INSIDE OF FRAME NOTE THRU HOLES NOTE RIB OVERLAP FLUSH SHEETING NOTE THE TWO RIDGE CAP HOLES IN EACH SHEET AND THEIR OREINTATION 26 ...
Page 27: ...I SCREW 1 1 4 SQUARE BEFORE MOVING ON AS NOTE THRU HOLES ZN NOTERIB OVERLAP _ NOTE THE TWO RIDGE CAP HOLES INEACH SHEET yx THEIR ORIENTATION I FLUSH SHEETING I I 124 x2 29 GA STEEL SHEETING n H I 7 _ 31 Phase 2 STEP 4 5 16 8 mm 1 8 3 mm HOLD SHEETING INSIDE OF FRAME NOTE THRU HOLES NOTE RIB OVERLAP FLUSH SHEETING NOTE THE TWO RIDGE CAP HOLES IN EACH SHEET AND THEIR OREINTATION MAKE SURE YOUR ROOF ...
Page 28: ...isimisiminisomosamissomarow A 8 411Mih a 0 0 h IP MP IP 7 e s e Phase 2 _ __ _ __ 6es LILMU F 1 2 0 40 760I10 16x1 1 4 WOODGRIP SCREW _ r I I 4J ilk 10 000 0 000 011 1 A W1 ifugurf ili v_______ __ __ 32 Phase 2 STEP 5 28 ...
Page 29: ...I IIII I MILMIC M I Mill r H 2 760 x32 SCREW 1 1 4 A A 1 8 3 mm NOTE HOLE LOCATIONS HOLD SHEETING TO INSIDE OF FRAME 124 x2 29 GA STEEL SHEETING 111111111 j 2 I FLUSH SHEETING Ili 1 A 0 NOTERIB OVERLAP N ______ 7 33 Phase 2 STEP 6 1 8 3 mm HOLD SHEETING INSIDE OF FRAME NOTE THRU HOLES NOTE RIB OVERLAP FLUSH SHEETING NOTE THE TWO RIDGE CAP HOLES IN EACH SHEET AND THEIR OREINTATION 29 ...
Page 30: ...I I irap N lemb 110 1 982 xv FLUSH 7 982 xt ROOF EDGE TRIM 1 983 xl ROOF EDGE TRIM ROOF EDGE TRIM SPLICE 759 x8 SCREW 3 4 1 iciIMIII 1 II11 1 7 1I n II NOTE IIINIMMOIll A SLIP EDGE TRIM INTO SPLICE L j ___ ENSURE THAT BOTH ENDS ARE FLUSH i WITH EDGE OF ROOF PANELS 7 1 SIDE VIEW 34 Phase 2 Ǣǻrƻ 7 SCREWS GO THROUGH EDGE TRIM AND INTO THE TOP OF THE RIBS IN THE APPROXIMATE LOCATIONS SHOWN TIPS DUE TO...
Page 31: ... ONCE IN PLACE INSTALL ATTACHMENT HARDWARE PERSON LIFT N 770 x2 n WASHER 5 16 1 479 x2 829 x2 NUT 5 16 BOLT 9 1 2 z 4 III 4 0 9 lite in 440 1 I 0 4 0 4ir 1 dil l SLIDE ROOF 7 A z LiN ysPTW AA LL RD HARDWARE 41 4 G z 7 i cl TIP I A THIRD PERSON IS HELPFUL TO ATTACH ROOF ONCE IT IS IN PLACE 391 x2 ____ __ SCREW 2 35 Phase 2 STEP 8 TIPS THREE PEOPLE ARE HELPFUL FOR THIS STEP POSITION A PERSON ON A LA...
Page 32: ...5 6 O 16 Lx Ti W 1 1 H 2 BLK x4 I 5 16x7 8 eal NNIN NN a i p ll o r ill i a Le _ 7 4 4 4 40 44 _40 4 _____ 0 _____ _ __ __ _ _ _ ___________ _ _ _ _ _ _ _ ___ 1__ ____ ___ __ _ _ __ ________ _ _ _ _ ____ NI lid p _____ Nctio ptle 4 t 41 404 4 r ilp 7 1 _ _ 407 x4 BOLT 1 1 2 198 x4 192 x41 WASHER 8x19 NUT BARREL 7 8 199 x4 WASHER 12x19 36 Phase 2 STEP 9 32 ...
Page 33: ... 8 x5 1 4 x32 3 8 36x134x823 H100199 WASHER LOCK EXT BLK H100198 WASHER LOCK EXT BLK I x16 12x19 x8 I 8x19 COMPLETE BOTH ENDS D7 4 1 f 1 Alitiv Iii ii 77 t 2 iffeNr fir 7 2 7 71ire V i y i x v rD7 1 I I I i 46 I I 205 x4 I BOLT 2 1 4 198 x4 WASHER 8x19 194 x4 41 1990 4 WASHER 12x19 BOLT 2 1 2 192 x4 NUT BARREL 7 8 1 j CD 0 192 x4 NUT BARREL 7 8 CD 199 x4 WASHER 12x19 37 Phase 2 STEP 10 33 ...
Page 34: ...CREW PWH BLK x30 I 8x1 1 4 x O 6 O 96 1 ROOF BRACKET A4M NOTE CENTER ROOF BRACKETS ON EACH li RAFTER AND ATTACH a as II I 4 r 536 x30 SCREW 1 4 961 x6 ROOF BRACKET 38 Phase 2 STEP 11 CENTER ROOF BRACKETS ON EACH RAFTER AND ATTACH 34 ...
Page 35: ...IDED RIDGE CAP SPLICE BY SLIDING EACH RIDGE CAP INTO THE SPLICE AS SHOWN UNTIL CENTERED 116 xo RIDGE CAP 29 GA 127 xl RIDGE CAP SPLICE IC 116 xo RIDGE CAP 29 GA 39 Phase 2 STEP 12 TIPS REMOVE BLUE FILM FROM RIDGE PARTS THEN ASSEMBLE THE PROVIDED RIDGE CAP SPLICE BY SLIDING EACH RIDGE CAP INTO THE SPLICE AS SHOWN UNTIL CENTERED 35 ...
Page 36: ...OVE SPACERS AS SHOWN LENGTH IS 117 1 16 MAX BEFORE INSTALLING _____ i TOP VIEW 117 1 16 in MAX WHEN ASSEMBLED 2974 mm RIDGE CAP FROMPREVIOUS STEP BOTTOM VIEW TV _ _ ____ J10 xl RIDGE CAP STIFFENER _ _ RIDGE CAP STIFFENER J9 xv RIDGE CAP STIFFENER J10 xv RIDGE CAP STIFFENER 398 xv RIDGE CAP PROTECTOR TOP ISO VIEW T 7 I I J10 I 833 do SCREW 3 4 398 xv RIDGE CAP PROTECTOR 40 Phase 2 STEP 13 ASSEMBLE ...
Page 37: ...LATION O 0 hiedirlricr 0 _ li m ftl ___ _ 111 NOTE USEPILOTHOLES 7 _ _ _ imi T A TTA HROOFPANEL 1 4 11 1 0 C i _ NOTE ALL SCREWS LAND IN PIPA 0 411 1 7 zi C STIFFERNER vi5rc 0 iii BOARDS 44r i giotOr i _ lb r tm _t __ IS 7 _________ _ riaft r IIII 1 a z 4 1 i 0 ___ _ 11 Jli ____ __ ____ __ w II i 4 it r ______ 7 _ I _ ______ _ 00 00 _ _ ___ _ __ ______ IA 392 odo SCREW 3 4 41 Phase 2 STEP 14 117 1...
Page 38: ...POST PLATE x8 A4M00978 POST ANCHORING PLATE x8 A4M00977 LAG SCREW WH BLK 5 16x1 1 2 x32 H100471 471 x32 LAG SCREW 1 1 2 Phase 3 STEP 1 978 x8 POST PLATE 977 x8 POST ANCHORING PLATE 38 ...
Page 39: ...FRONT BYD ID TAG SMALL WITHOUT AGES x1 A100241 SCREW PFH BLK 8x1 1 2 x2 H100200 241 x1 BYD ID TAG 200 x2 SCREW 1 1 2 Phase 3 STEP 2 39 ...
Page 40: ...FOR INSTALLATION ON WOOD DECK YOU MUST ENSURE THERE IS AMPLE STRUCTUAL SUPPORT UNDER DECK 630 x16 WASHER 8x19 120 x16 SCREW 2 WASHER FLAT BLK 8x19 x16 H100630 SCREW CONCRETE ANCHOR 1 4x2 x16 H100120 NOTE PRE DRILL HOLES FOR CONCRETE ANCHORS USING A 3 16 CONCRETE DRILL BIT Phase 3 STEP 3 40 ...
Page 41: ...ENCLOSURE FOR ELECTRICAL ENCLOSURE INSTALLATION REFER TO ASSEMBLY INSTRUCTIONS THAT COMES PACKAGED WITH THE ELECTRICAL ENCLOSURE KIT INSTALL ON ANY POST THAT IS DESIRED FOLLOW DIRECTIONS FOR PROPER INSTALLATION 41 ...