SLIDE ASSEMBLY
STEP 2
●
PLACE 1 SLIDE RAIL ON A FLAT SURFACE AND BEGIN INSERTING SLIDE BED AT THE BOTTOM OF THE
SLIDE RAIL (FIG. 1). PUT SLIDE SUPPORT BOTTOM INTO THE SUPPORT POCKET AT THE BOTTOM OF THE
RAIL AND HAVE A HELPER BEND THE SLIDE BED TOWARDS THE TOP OF THE SLIDE AND INSERT
THE BED INTO THE SLIDE CAVITY. MAKE SURE SLIDE BED IS COMPLETELY DOWN IN THE SLIDE
CAVITY. SECURE USING (12) 2 1/2" WOOD SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN BELOW.
●
PLACE THE OTHER SLIDE RAIL ON A FLAT SURFACE WITH THE SLIDE CAVITY UP. HAVE A HELPER
HOLD THE TOP END OF SLIDE BED AND BEGIN INSERTING THE SLIDE BED AND SLIDE BRACES INTO
THE CAVITY AND SUPPORT POCKETS STARTING AT THE BOTTOM OF SLIDE AND WORKING UP TO
THE TOP(FIG. 2). SECURE USING (12) 2 1/2" WOOD SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN BELOW.
TIP: A HELPER IS REQUIRED FOR THIS PHASE.
NOTE:
MAKE CERTAIN
SUPPORTS AND SLIDE
BED ARE FULLY
ENGAGED WITHIN
CHANNEL OF SLIDE
RAILS.
FIG. 1
FIG. 2
M78 - CENTER SLIDE BRACE - W4L08749
5/8"x3 3/8"x17 1/4" (16x86x438)
(2)
EK - SLIDE RAIL 8' GREEN RIGHT - A100054
(1)
EL - SLIDE RAIL 8' GREEN LEFT - A100055
(1)
SCREW PFH
8x2 1/2
(24)
TIP:
DRILL 1/8" HOLES
IN DIMPLES OF
SLIDE RAIL.
SLIDE RAIL 8' GREEN RIGHT
SLIDE RAIL 8' GREEN LEFT
M78
SCREW PFH 8x2 1/2
(24 PLCS)
Summary of Contents for 1801011
Page 49: ...ROCK WALL ASSEMBLY STEP 3 T NUT 1 4 24 PLCS T NUT 1 4 24 ...
Page 112: ......
Page 158: ...NOTES ...
Page 159: ...NOTES ...
Page 160: ...NOTES ...