background image

- BEFORE YOU BEGIN -

Includes 8’x12’ (244x367 cm), 8’x16’ (244x488 cm)  
                  Building Instructions

We manufacture kits from select construction grade lumber and engineered wood products.  Construction grade lumber, 
a product cut from trees, has many natural characteristics and blemishes that may be present in some of the pieces 
you receive in your kit. Natural characteristics and blemishes in construction lumber may include knots, torn wood grain 
along edges, minor cracks/splits, twists, limited bark along edges and pitch pockets that may exude sap. Be assured that 
the individual parts have been cut and inspected to remove as many of the wood’s natural, less appealing characteristics 
as possible. These characteristics and/or blemishes will not affect the strength, durability, or structural integrity of the 
 nished product. Generally, the exterior trim parts selected for your kit are graded from only one side and should be 
installed with the most attractive side outward.  Our limited warranty does not cover the natural characteristics and 
blemishes that occur with construction grade lumber products.

- ANTES DE EMPEZAR -

Tools required
(Herramientas 
necesarias)

Hammer

(martillo)

 Phillips Screw-

driver
(Desarmador cruz)

 Level

(Nivel)

 Ladder

(escalera)

 Pencil

(lápiz)

 Tape Measure

(Cinta métrica)

 Utility Knife

(Navaja)

 Paint Tools

(Herramientas 
para pintar)

 Caulk Gun

(pistola para ma-
sillado)

 Hand Saw

(Sierra portátil)

 Wood Glue

(Pegamento para 
madera)

Optional Tools

(Herramientas 
opcionales)

 Electric Drill w/ 

#2 Phillips Tip
(Taladro eléctrico 
Broca “Phillips”) 

 Chalk Line

(Linea de marcar)

 Square

(Escuadra) 

 Nail Pouch

(Bolsillo para 
clavos)

Fabricamos nuestros equipos de madera elaborada y de productos maquinados de madera. La madera elab-
orada, producto de árboles, tiene muchas características e imperfecciones naturales que puedan tener algunas 
piezas contenidas en el equipo. Estas imperfecciones y características pueden incluir nudos, grano rasgado 
sobre el borde, rajas/grietas pequeñas, torsiones, cortezas en el borde, y bolsos que exuden savia. Asegurams 
que hemos cortado e inspeccionado las partes individuales para eliminar las características naturales menos 
atractivas posibles. Estas características y/o imperfecciones no afectarán la fuerza, durabilidad ni la integridad 
estructural del producto  nal. Po lo general, las piezas de moldura exterior seleccionadas para su equipo se 
elaboran de un solo lado y deben ser instaladas con la parte más atractiva por fuera. Nuestra garantía limitada 
no cubre las características e impefecciones que ocurren con los productos de madera elaborada.

Heritage / Signature Series 

     Instrucciones para edi cios de

 

8’x12’ (244x367cm), 8’x16’ (244x488 cm)

8’ Wide Saltbox

Techo a dos aguas 8’

First...

Check with your local building authority before erecting.

Read instructions thoroughly before you begin.  

Building Codes

Our buildings are designed to meet most local and national  

   U.S. codes and are not meant to be used for living space.

General construction drawings can be provided.

Stamped certi ed drawings can be provided for a fee.  

   Call for details.

Check All Parts

If a part is missing, circle the part in question and call.

● 

Please note the primer color may vary on siding and 

   trim parts. This is a factory applied primer intended for 
   preparing your building for painting. This is NOT a  nish 
   coat. This primer color variation will not affect the look of 
   your building once painted.

Important

Lumber is graded from one side, use most attractive 

   face to the outside.

In a drawing, a dotted line represents a part hidden from 

    view (like a part under a panel).

Assistance required

Assistance is necessary to handle,  t, and secure 

    some components.  

Squareness is very Important!

Keep 90° corners and 90° perpendiculars throughout  

   the assembly to ensure all components  t together.

Check foundation size

Before starting on your foundation, make sure you are 

   building the correct size foundation for your building.

Always wear OSHA-APPROVED safety 

glasses throughout assembly process

Primero...

 

Consulte la autoridad de construcción local antes de con-

struir el edi cio.

 

Lea las instrucciones completamente antes de empezar.

Códigos de Construcción

 

Hemos diseñado nuestros edi cios a que conformen con 

todos los códigos de construcción locales y nacionales.  Los 
edi cios no están proyectados como residencia.

 

Se disponen planes generales de construcción.

 

Se disponen de planes certi cados por un precio.  Es-

tos planes no garantizan la aprobación de los autoridades 
locales.

Compruebe todas las piezas

 

Si falta una pieza, indícala con un círculo y llámenos.

 

Aviso:  El color del imprimador puede variar en la covertura 

y las partes de la moldura.  Este imprimador se aplica en la 
fábrica y es para preparar  su edi cio para pintar.  NO es una 
capa de pintura terminada.  La variación en el color del impri-
mador no afectará la apariencia de su edi cio al pintarlo.

Importante

 

La Madera está elaborada en un solo lado. Use el lado más 

atractivo en el exterior.

 

Si falta una pieza, póngale un círculo y llámenos.

 

En un dibujo una línea punteada representa una pieza no 

   vista (por ejemplo, una pieza debajo de un panel)

Ayuda requerido

 

Seleccione un sitio nivelado.

 

Será necesario pedir ayuda para manejar, unir, y reforzar 

algunas piezas.

¡Es preciso escuadrar el edi cio!

 

Mantenga ángulos de 90° en las esquinas y los perpen-

diculares durante la construcción para asegurar que todas 
las piezas se unen correctamente.

Comprueba las dimensiones de la 

cimentación.

 

Compruebe que las dimensiones de la cimentación son las 

correctas para el edi cio.

Siempre lleve gafas de seguridad aproba-

das por OSHA durante la construcción.

07/22/2011

Shown with extenders
Demostrado con Extensiones

16674-T

Customer Service
(Servico al cliente)
1-888-827-9056
1000 Ternes Drive
Monroe, MI 48162

Summary of Contents for Heritage Series

Page 1: ...OVIDE ASSISTANCE PRIL THROUGH CTOBER TO 0 34 3ATURDAY TO 0 34 OVEMBER THROUGH ARCH TO 0 34 4 3 6 6 2 _ 3 3I DESEA M S INFORMACI N SOBRE EL MONTAJE LL MENOS SIN COSTE ADICIONAL ALGUNO AL SIGUIENTE TEL...

Page 2: ...4HIS PAGE INTENTIONALLY LEFT BLANK STA P GINA EST INTENCIONADO EN BLANCO...

Page 3: ...ructions thoroughly before you begin Building Codes Our buildings are designed to meet most local and national U S codes and are not meant to be used for living space General construction drawings can...

Page 4: ...or ROOF GABLE TRIM DOOR W Puerta izquierda Puerta derecha x2 C x2 x23 SP UM 3 8 x23 7 8 x72 9x61x183 cm 2 x4 x48 5x10x122 cm 2x4x94 1 2 240 cm 2x4x92 1 2 235 cm UN TJ x2 2x4x24 61 cm 7 16 x23 x48 1 1x...

Page 5: ...4x60 Dimensiones Verdadera 5x10x173 cm 5x10x122 cm 2x6x48 5x15x122 cm 7 16 x23 x48 1 1x58x122 cm K x1 Viga Rafter x2 QG QF 2 5X10X152 cm ZT x2 5 8 x4 x48 1 6x10x122 cm 3 8 x9 3 16 x47 7 8 0 95x23x122...

Page 6: ...LOS MATERIALES ANTES DE EMPEZAR A MONTAR SU EDIFICIO Wood is a natural product that has inherent blemishes All interi or framing is graded for structural strength and not appearance Exterior trim is...

Page 7: ...DEL SITIO El sitio debe de estar nivelado correctamente Instale una barrera contra yerbajos debajo de la estructura Important Square oor and level to ground before beginning assembly of building Impo...

Page 8: ...erta y construya el muro con la puerta primero WALL NUMBER EQUALS PAGE NUMBER BUILD WALL NUMBERS SPECIFIED EL NUMERO DEL MURO CORRESPONDE AL NUMERO DE LA PAGINA CONSTRUYA LOS N MEROS DE LOS MUROS ESPE...

Page 9: ...OS Y DEL TECHO ANTES DE CLAVARLOS COMPLETAMENTE PARA ASEGURAR LA ESCUADRA Asegure que se construyan los muros como en los dibujos abajo CONSTRUYA EL MURO CON PUERTA PRIMERO Make sure all walls are bui...

Page 10: ...mo en el dibujo Alinee escuadra el panel por mover los extremos opuestos arriba o abajo hasta que el panel est nivelado a lo largo del punto m s alto de las vigas y f jelo con un clavo en cada esquina...

Page 11: ...Vista terminal 24 61 cm 92 1 2 235 cm 71 180 cm UM x5 24 61 cm 24 61 cm 20 1 2 52 cm TJ x2 3 7 6 cm 2 5 cm A x2 96 244 cm 3 1 2 8 9 cm 1 2 5 cm 6 15 cm 12 30 cm Top Parte Superior See Page 8 For Build...

Page 12: ...71 180 cm UM x6 24 61 cm 16 41 cm 16 41 cm 20 1 2 52 cm TJ x2 SP x2 End View Vista terminal End View Vista terminal 140 1 2 357 cm 144 366 cm 3 1 2 8 9 cm 92 1 2 235 cm 48 122 cm 64 163 cm 20 1 2 52...

Page 13: ...Parte Superior Top Parte Superior See Page 8 For Building Tip End View Vista terminal End View Vista terminal Flush Nivelado Ver la p gina 8 para un consejo 16 41 cm 64 163 cm 140 1 2 357 cm 24 61 cm...

Page 14: ...ta terminal End View Vista terminal 71 180 cm UM x6 140 1 2 357 cm 24 61 cm 24 61 cm 16 41 cm TJ x2 SP x2 12 1 2 32 cm 64 163 cm 144 366 cm 6 15 cm 3 1 2 8 9 cm 1 2 5 cm B C B 144 366 cm 140 1 2 357 c...

Page 15: ...nsejo Algunas con guraciones utilizar n 2 paneles C aqui Some con gurations will utilize 2 C panels here WALL 13 x 32 MURO 13 3 7 6 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 20 1 2 52 cm 92 1 2...

Page 16: ...1 2 479 cm 24 61 cm 24 61 cm 16 41 cm 64 163 cm 16 41 cm 24 61 cm 20 1 2 52 cm Top Parte Superior End View Vista terminal End View Vista terminal B x4 192 488 cm C C B 6 15 cm 3 1 2 8 9 cm 1 2 5 cm 1...

Page 17: ...rminal End View Vista terminal SP x2 SP x2 UM x8 188 1 2 479 cm 12 1 2 32 cm 71 180 cm 64 163 cm 16 41 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm TJ x2 192 488 cm 6 15 cm 3 1 2 8 9 cm 1 2 5 cm C B C C B 1...

Page 18: ...2 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 16 41 cm 71 180 cm 192 488 cm 6 15 cm 3 1 2 8 9 cm 1 2 5 cm B B C C C C Top Parte Superior End View Vista terminal 188 1 2 479 cm 64 163 cm 24 61 cm 16 61 cm 2...

Page 19: ...479 cm 3 1 2 8 9 cm 188 1 2 479 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 20 1 2 52 cm Top Parte Superior Top Parte Superior See Page 8 For Building Tip Ver la p gina 8 para un...

Page 20: ...m 2 5 cm x 18 Wall Muro 11 ERECTING WALLS See Page 7 for Building Tip Ver la p gina 7 para un consejo Ver la p gina 7 para un consejo 3 7 6 cm 3 7 6 cm 3 7 6 cm 3 7 6 cm 3 7 6 cm 12 30 cm 2 5 cm 2 5 c...

Page 21: ...la p gina 7 para un consejo ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm 12 30 cm 2 5 cm 12 30 cm 2 5 cm See Page 6 for wall Ver la p gina 6 para muro Nivele la pared y clave Level Wall and Nail Re...

Page 22: ...S 8 X 16 244 x 488 cm x 56 8 x12 244 x 366 cm x 68 8 x16 244 x 488 cm 3 7 6 cm 1 5 8 4 13cm 1 5 8 4 13 cm 100 254 cm VF UN UN VK VF VF VF VK 1 5 8 4 13 cm 1 5 8 4 13 cm 100 254 cm VK UN VF VK UN VF IN...

Page 23: ...OOF x 40 End Rafter Assembly x2 TECHO Conjunto de vigas terminales x2 1 1 2 3 8 cm x 24 x1 x1 109 1 4 277 cm Q QF QG Flush Nivelado Q Glue Pegamento 109 1 4 277 cm Q Flush Nivelado Q Glue Pegamento QF...

Page 24: ...ddle Rafter Assembly See sizes below for quantity Conjunto de vigas centrales Ver las dimensiones abajo para la cantidad x 8 109 1 4 277 cm QG QF Flush Nivelado Q Glue Pegamento Glue Pegamento 2 5 cm...

Page 25: ...s dimensiones 3 7 6 cm x36 8 x12 244 x 366 cm Shown Indicado End Rafters have one gusset to the inside Las vigas terminales tienen una placa de uni n 3 7 6 cm x48 24 61cm 24 61cm 24 61cm 24 61cm 24 61...

Page 26: ...ROOF x 40 TECHO 8 x16 244 x 488 cm x112 x160 2 5 cm See Page 8 for Building Tip 8 x12 244 x 366 cm Shown Indicado Ver la p gina 8 para un consejo F E M G F E J I M G E F L H E F L H K J 24...

Page 27: ...ROOF x 40 TECHO Gable Panels Paneles del techo a dos aguas x 76 1 1 2 3 8 cm x2 1 3 4 4 4cm 1 3 4 4 4cm 7 17 5cm 1 1 2 3 8cm 8 20cm RL RL R R R S S S 25...

Page 28: ...TRIM x 40 MOLDURA x 21 2 5 cm ZP ZJR ZKL YX T YX ZKR YX ZP T N N O TRIM x 40 MOLDURA x 66 2 5 cm 26...

Page 29: ...8 x16 244 x 488 cm x 40 8 x12 244 x 366 cm Shown Indicado 2 5 cm TRIM MOLDURA x 28 ZP x4 ZP x4 ZT x2 27...

Page 30: ...ted sill on concrete slab if desired Place a center mark for door location Ponga un se al en el centro para la puerta Corte la placa inferior en la abertura de la puerta Deje la solera tratada en la l...

Page 31: ...las puertas abren bien y clave Attach with 3 7 6 cm Screws rst check doors to open properly and nail x 48 2 5 cm TRIM MOLDURA Inside Building Interior del edi cio 12 30 cm ZJ ZJ ZJ ZO x 4 ZO ZO x4 ZJ...

Page 32: ...DOOR PUERTA DOOR PUERTA Plain Diamond Traditional X Contemporary Double X Outer Diamond Inner Diamond 3 4 1 9 cm x 32 30 ZWL ZWL ZWR ZWR Y x 8 ZWR x 2 ZWL x 2...

Page 33: ...terior Moldura Visi n Interior DOOR PUERTA 2 5 cm x 12 UP x 2 Existing Door Top View Attaching Door Stiffiner Puerta Existente Visi n De arriba Atadura del apoyo de la puerta 2 screw Outside Al aire l...

Page 34: ...DOOR PUERTA 1 2 5 cm x 34 Flush Al ras Flush Al ras DWS DEL DEL Flush Al ras 32...

Page 35: ...cm 1 3 4 4 4cm 35 3 4 91cm If installing optional 3 point lock refer to the next 2 pages If not skip to page 40 Si instalando opcional 3 cerradura del punto se re ere a las pr ximas 2 p ginas Si no s...

Page 36: ...OPTIONAL 3 POINT LOCKING MECHANISM OPCIONAL See next page for mounting location of brackets and plates Vea pr xima p gina para montar par ntesis 34...

Page 37: ...u a para ayudar plato seguro al suelo 1 Locate exact plate position and mark guide hole 2 Drill a 3 8 hole 2 1 2 deep going into the header 3 Fasten plate with the screws and washers provided 2a Drill...

Page 38: ...o centrado en moldura Z x2 HOOK AND EYE AND BARREL BOLT x 2 x 2 Hooks and eyes should go into a trim or stud Hay que fijar los corchetes a la moldura o un montante NOTE Install hook and eye into trim...

Page 39: ...ntable Caulk at all horizontal and vertical seams between the Trim and Walls and all around the Door Trim Use a high quality exterior acrylic latex paint When painting your building there are a few ke...

Page 40: ...velado al gotero Okay if Shingle Overlaps Est bien si la teja sobresale Line up notch on top of Shingle with edge of Roof to stagger the Shingles Alinee el corte encima de la teja con el borde del tec...

Page 41: ...lientes hinque cla vos sobresalientes en la madera or c rtelos nivela dos con la madera Keep grass trimmed and away from building Corte y quite la hierba cerca del edi cio Keep Sprinklers away from bu...

Page 42: ...tain the siding using 100 acrylic latex exterior product with a minimum of two 2 coats within sixty 60 days of installation caulk above all doors and all horizontal and vertical trim boards paint and...

Page 43: ...exteriores con un m nimo de dos 2 capas dentro de los sesenta 60 d as de la instalaci n masillar sobre todas las puertas y todas las molduras horizontales y verticales pintar y sellar todos los bordes...

Reviews: