![background image](http://html1.mh-extra.com/html/backyard-play-systems/4097/4097_manual_3378622027.webp)
R OOF/CANOPY
:;-
25
ROOF TRIM
INSTALL
Flush
Flush
1-5/8" Wood Screws
x8
DO NOT OVER-TIGHTEN SCREWS. KEEP
SCREW HEAD FLUSH WITH TOP OF BOARD.
Install 2511-ST centered and flush to bottom of 2512-ST using four 1-5/8" screws from inside.
x2
5/4 x 6 x 11-3/4"
2511-ST
Pre-drill 1/8" pilot holes.
ROOF PLANKS
INSTALL
Flush at
peak.
Center roof boards on rafters.
Ensure equal overhang on both sides; about 15/16".
43-1/8"
Maintain 43-1/8" dimension
between rafters.
15/16"
15/16"
2-1/2" Wood Screws
x8
x2
WARNING! Install screws flush with roof
board to avoid protruding below roof.
5/4 x 6 x 47"
X 47000506-ST