ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND SUPPORT
POCKET, SECURE USING 2-1/2" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH
8x2 1/2"
(x38)
H100090
090
(x19)
SCREW - 2 1/2"
090
(x19)
SCREW - 2 1/2"
NOTE:
STEP 4
SLIDE ASSEMBLY
32