Phase 1
STEP 1
015
(x1)
TOP LEG
020
(x2)
LEG CONNECTING TUBE
019
(x4)
METAL BRACKET GREY
014
(x1)
MIDDLE LEG
MIDDLE LEG
(x4)
A4M01014
TOP LEG
(x4)
A4M01015
LEG CONNECTING TUBE
(x8)
A4M01020
NOTE: REPEAT THIS STEP 4 TIMES.
TIP: PLACE CARRIAGE BOLT BEFORE NUT BARREL.
METAL BRACKET GREY
(x16)
A4M01019
013
(x1)
BOTTOM LEG
BOTTOM LEG
(x4)
A4M01013
BOLT CARRIAGE WZ
5/16x2-1/2
(x12)
H100591
NUT BARREL WH WZ
5/16x7/8
(x16)
H100499
BOLT CARRIAGE WZ
5/16x2 3/4
(x4)
H100811
NOTE: TWO VERTICAL
HOLES TOWARD TOP
NOTE: TWO HORIZONTAL HOLES ON BOTTOM
591
(x1)
BOLT - 2-1/2
591
(x2)
BOLT - 2-1/2
811
(x1)
BOLT - 2 3/4
499
(x4)
NUT BARREL - 7/8
DO NOT FULLY TIGHTEN
BOLT AS IT WILL BE REMOVED
IN A LATER STEP.