STEP 64
USING M105 ATTACHMENT BOARD AS A TEMPLATE, MARK AND DRILL (2) 7/16" OR
10 MM THROUGH HOLES INTO G4 FLOOR RAIL.
NEXT INSERT (2) T-NUTS INTO THE
SIDE FACING AWAY FROM THE FORT, AS SHOWN.
(1) 5 FT ROCKWALL ASSEMBLY
BOLT WH 5/16x1-1/2
(2 PLCS)
T-NUT 5/16
(2)
M105
G4
WASHER LOCK EXT 8x19
(2 PLCS)
T-NUT 5/16
(2 PLCS)
BOLT WH
5/16x1-1/2
(2)
WASHER
LOCK EXT
8x19
(2)
M105
G4
ROCKWALL ASSEMBLY
4 5/8"
1 11/16"
1 1/2"
15"
USING GRAB HANDLE AS A TEMPLATE, MARK AND DRILL (2)
7/16" OR 10 MM THROUGH HOLES INTO E3 BOARD.
E3
B1
LAG SCREW WH 5/16x1-1/2
(2 PLCS)
BOLT WH 5/16x1-1/4
(2 PLCS)
NUT BARREL WH 5/16x5/8
(2 PLCS)
WASHER LOCK EXT 12x19
(2 PLCS)
E3
FX - HAND GRIP METAL GREEN 381 c/c - A100118
(2)
LAG SCREW
WH 5/16x1-1/2
(2)
BOLT WH
5/16x1-1/4
(2)
WASHER
LOCK EXT
12x19
(2)
NUT BARREL
WH 5/16x5/8
(2)
TOP EDGES OF 'M105' ATTACHMENT
BOARD AND 'G4' FLOOR RAIL ARE
FLUSH.
M105 - ATTACHMENT BOARD - W103002
5/8"x3 3/8"x22 7/8" (16x86x580)
(1)
TOP
SCREW PFH
8x1-1/2
(4)