10 FOOT SLIDE ASSEMBLY
STEP 4
Ɣ
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 2-1/2" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
Ɣ
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH 8x2 1/2
3/&6
SCREW PFH 8x2 1/2
3/&6
SCREW PFH
8x2 1/2
(38)