![background image](http://html.mh-extra.com/html/bac/rc-series/rc-series_rigging-and-assembly-instructions_464478015.webp)
W W W . B A L T I M O R E A I R C O I L . C O M . A U
13
M A R 2 0 8 - 0
Optional Accessory
& Loose Item Installation
Fitting of Wind Walls
Piping
All piping must be supported external to the tower and restraint provided
to ensure no vertical or horizontal movement of the piping. All piping
and supports are to be furnished by others.
Fan Speed
When the fan speed of this product is to be changed from the factory
set speed, including the use of a variable fan speed control device, steps
must be taken to avoid operating at or near the fan’s “critical speed”
which could result in fan failure and possible injury or damage.
Bleed Line Installation
On all RC Series products install a bleed line with valve between the
system circulating pump discharge riser and a convenient drain. Locate the
bleed line in a portion of the riser piping that drains when the pump is off.
WARNING:
The bleed valve
should always be open when
the unit is in operation,
unless the bleed rate is
automatically controlled by
a water treatment system.
Recommended bleed rates
may be found in the Operating
and Maintenance Manual or by
consulting a competent water
treatment specialist.