WWW.BALTIMOREAIRCOIL.COM
4
WWW.BALTIMOREAIRCOIL.COM
4
Figure 1.
PT2 Cooling Tower
PT2
Unit Operation and Storage
1
Start-Up Procedure
Considerations for Initial Start-Up
• For units with independent fan control,
see
page 30
.
• For units with VFDs, see
page 30
.
• For units with vibration cutout switches, see
page 28
.
Access Door
Axial Fan
Fan Guard
Hot Water
Distribution
Fill
BALTIDRIVE
®
Power Train
(Internal Motor Shown)
InterLok™
System
Water Outlet with Strainer
Cold Water Basin
Make-up Valve
Adjustment Float
Combined Inlet Shields
Drift Eliminators
Hot Water Inlet (Not Shown)
Basin Heater (Optional)
Motor Davit
(Optional)