WWW.BALTIMOREAIRCOIL.COM
24
Figure 38.
Mechanical Access Platform – PFi/PCC-1236 (two fan),
2436 (two fan), PCC-1240
Mechanical Access Platform for Multi-cell Units (Optional)
1. Follow the instructions for the Mechanical Access Platform on page 22.
2. For the two fan PFi/PCC-1236 and 2436, the Mechanical Access platform spans two
cells. See
Figure 38
,
Details A
to
D
for the bridging components.
3. Secure the toe board PGP using the 5/16” self-tapping screws provided. See
Detail D
.
4. Secure the grating bridge plate PCC using the 1/4” x 2” self-drilling screws provided.
5. Install the gap cover channels PIP using the 3/8” x 1 1/4” bolts provided. See
Detail B
.
Detail A
Detail B
Detail C
Detail D
PIP
PCC
PGP
NOTE:
The screws pass through
openings in the grating and
fasten to the frame underneath.
See
Detail C
.