6
RIGGING
WATER CONNECTIONS
Balancing valves must be installed on all water inlet connections to
adjust the flow through each connection.
COIL CONNECTIONS
Coils of ICE THERMAL STORAGE units are filled with a low inert gas
at the factory before shipping, to ensure an optimal internal
corrosion protection.
On site, the pressure needs to be released from the coil by opening
the pressure relieve valve and removing the pipe caps.
For NH3 coils cut the threaded pipe-end and bevel for welding on
site. Make sure to protect the unit against sparks from the cutting
process with a suitable material. Next connect the pipework to the
coil connections by welding.
1. If coils are supplied filled with nitrogen, the nitrogen pressure
should be relieved through the supplied relief valve before
removing the cap.
2. If units remain on site for a long period without being installed,
coils must be kept closed to avoid condensation and corrosion.
REFRIGERANT CONNECTIONS ON SITE
All connections in the external pipework (installed by others) must
be leak free and tested accordingly. All piping external to BAC
cooling equipment must be supported separately.
PURGE REQUIREMENTS
The installer of BAC equipment must ensure proper system purging
of air prior to operation. Entrained air can obstruct the proper flow of
glycol solution, resulting in higher operating pressures than design
and reduced thermal storage capacity.
Figure 7: Rigging Dimensions for TSC coil only
Model
L
(mm)
W
(mm)
H
(mm)
H1
(mm)
TSC-95C
TSC-115C
TSC-120C
TSC-145C
TSC-170C
TSC-200C
TSC-225C
2654
3258
2654
3258
3861
4464
5070
1055
1055
1350
1350
1350
1350
1350
1912
2260
TSC-185C
TSC-230C
TSC-270C
TSC-310C
TSC-350C
2654
3258
3861
4464
5070
1055
1912
2260
TSC-290C
TSC-340C
TSC-400C
TSC-450C
3258
3861
4464
5070
1350
1912
2260
TSC-480C
TSC-590C
TSC-700C
TSC-800C
TSC-910C
TSC-1050C
2721
3327
3928
4534
5137
4030
1350
1912
2260
TSC-790D
TSC-940D
TSC-1080D
TSC-1220D
TSC-1440D
3327
3931
4534
5140
6045
1645
2102
2448
Table 4: Approximate Dimensions TSC-C and TSC-D
TSU-C/D piping