3 - 36
Main unit
Main parts
9
Operation PCB assembly attachment
1. Connect the connector
1
on the operation PCB assembly
2
.
*Key point
• Check that the lead wire of the connector
1
passes under the
left upper guide
3
of the operation PCB holder
4
.
2. Attach the operation PCB assembly
2
to the operation PCB holder
4
with the 4 screws
1
.
3. Connect the connector
5
and the FFC
6
on the operation PCB assembly
2
.
*Key point
• Pull up the lock of the connector on the operation PCB
assembly
2
to release it, insert the FFC
6
, and then push
down the lock to secure the cord.
1
Torque
0.39 – 0.79 N·m
5
1
2
6
1
4
3
Taptite, Bind B
M
3X8
Summary of Contents for BLMY
Page 1: ......
Page 2: ......
Page 3: ......
Page 19: ...1 8 ...
Page 21: ...2 2 Main parts location diagram Main unit ...
Page 30: ...2 11 Disassembly Electrical parts and motors location diagram Main unit ...
Page 37: ...2 18 Thread tension mechanism location diagram Main unit ...
Page 43: ...2 24 Bobbin winder mechanism location diagram Main unit ...
Page 49: ...2 30 Needle bar presser mechanism Upper shaft mechanism location diagram Main unit ...
Page 53: ...2 34 Needle presser module breakout diagram 78 Modules ...
Page 66: ...2 47 Disassembly Feed and bobbin module breakout diagram Modules ...
Page 75: ...2 56 Thread cutter module breakout diagram Modules ...
Page 79: ...2 60 ...
Page 81: ...3 2 Needle bar presser mechanism upper shaft mechanism location diagram Main unit ...
Page 90: ...3 11 Assembly Bobbin winder mechanism location diagram Main unit ...
Page 94: ...3 15 Assembly Thread tension mechanism location diagram Main unit ...
Page 102: ...3 23 Assembly Electrical parts and motors location diagram Main unit ...
Page 109: ...3 30 Main parts location diagram Main unit ...
Page 120: ...3 41 Assembly Needle presser module breakout diagram 78 Modules ...
Page 139: ...3 60 Feed module breakout diagram Modules ...
Page 155: ...3 76 Thread cutter module breakout diagram Modules ...
Page 161: ...3 82 ...
Page 191: ...4 30 ...
Page 226: ......