2.Put on the water tank
1.Intall the boiler cover
Install the boiler cover. After installation,
firmly press down on the boiler cover.
Install the water tank. Secure the water
tank in the card slot of the machine to
stabilize the water tank.
06
05
1.combine the upper and lower parts first
2.mixing chamber is docked with the
fuselage