
Direct Service Done Right
Since 1948, Nystrom has been the go-to manufacturer of specialty building products providing a wide range of floor, roof, wall,
ceiling, and stair access products that create safer, more accessible buildings. We offer hassle-free services including access
to
technical experts, REVIT tools for BIM, HPDs for LEED v4, 3-part specifications and AIA-accredited continuing education courses.
©2023 Babcock-Davis, Inc.
Rev 02/2023
Installation & Ope Maintenance
AcousticMAX Smoke Vent
Model(s): BSVZ/BSVY
7
Great Products. Better Partners.
Babcock-Davis is a leader in roof hatches, smoke vents and safety railings for the commercial roofing market. We also manufacture architectural
access and safety-related building products for commercial structures. Babcock-Davis provides local connections through a broad distribution
network to accelerate and simplify the building process for contractors and building owners, offering hassle-free services including access to
technical experts, REVIT tools for BIM, HPDs for LEED v4, 3-part specifications and AIA-accredited continuing education courses.
Reset at Roof Level
1.
Feed out a minimum of 14’ of cable at lower winch to create slack
.
2.
At upper winch, remove spent fusible link from the system by removing the retaining
lock nuts. Reseat the spring attached to the lever arm to the winch housing. Pull the
lever arm up, bring the two screws close enough to set the new fusible link in place and
secure with the retaining lock nuts. (Only if thermally released)
3.
Flip the ratchet at upper winch up to the engaged position.
4.
Wind upper winch until the cable is taught.
5.
The thermal release is now reset. Vent can be winched closed by lower winch.
Installation Instructions for Manual Winch
1.
Once the smoke vent has been roofed in and is fully installed the manual winch option
can be set up to operate the doors to open and close.
2.
Determine the desired location for the floor level winch (shipped loose) and mount it
to a suitable structure.