PD Test Setup
© b2 electronic GmbH
DHV0088
56
4.11 Disconnection Failure
In case of errors or failure due to a loss of power during testing, additional precaution is required. The HVA LED red light cannot
indicate when residual voltage is less than 100V.
To guarantee that the residual voltage has dissipated before removing the test lead, the DUT must be de-energized using a
discharge stick.
Summary of Contents for PD Series
Page 2: ...b2 electronic GmbH DHV0088 2...
Page 4: ...b2 electronic GmbH DHV0088 4...
Page 27: ...General Description b2 electronic GmbH DHV0088 27 PDTD200 2 CC Filter...
Page 29: ...General Description b2 electronic GmbH DHV0088 29...
Page 37: ...General Description b2 electronic GmbH DHV0088 37...
Page 58: ...PD Test Setup b2 electronic GmbH DHV0088 58 4 12 PDTD 2 Disconnection PD Measurement...
Page 65: ...Declaration of Conformity b2 electronic GmbH DHV0088 65...
Page 66: ...Declaration of Conformity b2 electronic GmbH DHV0088 66...