Instruction for Use
19
PRO-110 / PRO-115
En
Guidance and manufacturer’s declaration - electromagnetic emissions
The PRO-110/PRO-115 is intended for use in the electromagnetic environment specified
below. The customer or the user of the PRO-110/PRO-115 should assure that it is used in
such an environment
Immunity Test
IEC 60601
Test level
Compliance
level
Electromagnetic environment
- guidance
Electrostatic
discharge (ESD)
IEC 61000-4-2
±6 kV contact
±8 kV air
±6 kV contact
±8 kV air
Floors should be wood,
concrete or ceramic tile.
If floors are covered with
synthetic material, the relative
humidity should be at least
30 %
Electrical fast
transient/burst
IEC 61000-4-4
±2 kV for power
supply lines
±1 kV for input/
output lines
±2 kV for power
supply lines
Mains power quality should be
that of a typical commercial or
hospital environment.
The electrical fast transient
burst (EFT) is generated by
the switching of inductive
loads. Separation between the
equipment and other loads
shall be considered before
installation. Mains filter is
required, if necessary.
Surge
IEC 61000-4-5
±1 kV line(s) to
line(s)
±2 kV line(s) to
earth
±1 kV line(s) to
line(s)
Mains power quality should be
that of a typical commercial or
hospital environment.
Voltage
dips, short
interruptions
and voltage
variations on
power supply
input lines
IEC 61000-4-11
<5% UT
(>95% dip in UT)
for 0.5 cycle
40% UT
(60% dip in UT)
for 5 cycle
70% UT
(30% dip in UT)
for 25 cycle
<5% UT
(>95% dip in UT)
for 5s
<5% UT
(>95% dip in UT)
for 0.5 cycle
40% UT
(60% dip in UT)
for 5 cycle
70% UT
(30% dip in UT)
for 25 cycle
<5% UT
(>95% dip in UT)
for 5s
Mains power quality should be
that of a typical commercial
or hospital environment. If
the user of the PRO-110/
PRO-115 requires continued
operation during power
mains interruptions, it is
recommended the PRO-110/
PRO-115 be powered from an
uninterruptible power supply
or a battery.
IM_PRO-110_PRO-115_EN_RO_BG_2916.indd 19
21.07.2016 11:39:03
Summary of Contents for PRO-110
Page 22: ...M_PRO 110_PRO 115_EN_RO_BG_2916 indd 22 21 07 2016 11 39 03...
Page 44: ...M_PRO 110_PRO 115_EN_RO_BG_2916 indd 44 21 07 2016 11 39 05...
Page 59: ...Bg PRO 110 PRO 115 59 5 A1 LOT M_PRO 110_PRO 115_EN_RO_BG_2916 indd 59 21 07 2016 11 39 07...
Page 67: ...M_PRO 110_PRO 115_EN_RO_BG_2916 indd 67 21 07 2016 11 39 08...