
36
Connect the Grounding Cables
Connect the grounding cables from each load cell to the threaded cable stand-off on
the weighbridge. Additionally, connect a grounding cable from the M8 bolt/nut on the
locating plate to the same stand-off on the weighbridge.
Adjacent weighbridges require an additional grounding wire from the threaded stand-
off on the weighbridge which is run to a stand-off on the next weighbridge in line.
STAND-OFF
Summary of Contents for Centurion-DT
Page 10: ......
Page 11: ......
Page 18: ...17 steel deck connection plates top view of concrete deck connection plates...
Page 46: ...45...