
24
Lower the module into place so that the connection shelves rest on top of the 4-cell
module’s load cell nests. Lower the opposite end of the module so that the button on
top of each stand is inserted into the thru hole located in the module’s load cell nest.
LOAD CELL NEST
UPPER CONNECTION
SHELF
LOAD CELL NEST
LOWER CONNECTION
BRACKET
CONNECTION
BOLT
Once the 2-cell module is resting on the dummy load cell stands and the 4-cell module
you can insert the 7/8”-9 X 5” bolts and flat washer thru the connection shelf and into the
top thru holes of the 4-cell module’s load cell nest. Once thru, insert flat washer, lock
washer and hand tighten the hex nut, leaving the bolt still loose in the connecting
modules at this point.
Summary of Contents for Centurion-DT
Page 10: ......
Page 11: ......
Page 18: ...17 steel deck connection plates top view of concrete deck connection plates...
Page 46: ...45...