![background image](http://html1.mh-extra.com/html/b-k-lighting/union-bollard/union-bollard_installation-instructions-manual_3124115004.webp)
Union Bollard
Installation Instructions
HOT
NEUTRAL
GROUND
RECEPTACLE
HOT
NEUTRAL
GROUND
- DIM
+ DIM
FIXTURE
HOT
NEUTRAL
GROUND
FIXTURE
WIRING DIAGRAM
Pull branch circuit wiring. Make watertight
connections from primary branch circuit to
pre-wired 12ga solid wire receptacle leads
using waterproof wire connectors. Connect
incoming ground and ground from receptacle
to ground wire on base.
See wiring diagram.
WIRING DIAGRAM - 0-10
Pull branch circuit wiring. Make watertight
connections from primary branch circuit to
pre-wired 16/5 round jacketed fixture head
leads using waterproof wire connectors.
Connect incoming ground and ground from
receptacle to ground wire on base.
See wiring
diagram.
WIRING DIAGRAM - INC
Pull branch circuit wiring. Make watertight
connections from primary branch circuit to
pre-wired 16/3 round jacketed fixture head
leads using waterproof wire connectors.
Connect incoming ground and ground from
receptacle to ground wire on base.
See wiring
diagram.
RECEPTACLE INSTALLATION DIAGRAM
FIXTURE INSTALLATION DIAGRAM
RELEASED DATE
02/22/2022
REFERENCE NUMBER
INS-2846-00
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS